Home solar in ZIP code 95458, California

Service city recorded on most installs: Lucerne. County: Lake County.

How many homes in ZIP code 95458 have solar?

PG&E, SCE and SDG&E interconnected 190 residential solar systems in ZIP code 95458 through Aug 31, 2026, 33 of them in the last 24 months (Sep 2024 through Aug 2026). The utilities recorded Lucerne, Lake County, as the service city on 190 of them. V3 Electric has the most installs recorded in this ZIP, 22.

Counts of interconnected systems from utility records, not a rating of any installer.

Data: California DG Stats interconnection records (Interconnected_Project_Sites_2026-08-31.zip), which run through Aug 31, 2026. ZIP codes are the service ZIP the utility recorded on each project.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

At a glance

Residential solar installs
190
Last 24 months
33 (Sep 2024 through Aug 2026)
Capacity
1,393.7 kW DC
Median system size
6.6 kW DC
Net Billing Tariff (NEM 3.0)
46 installs, 24.2% of those with a tariff recorded
Utility
PGE 190
First install in data
May 18, 2004
Latest install in data
Jul 28, 2026

Installs by year

YearInstalls interconnectedWith battery storage
200410
200520
200610
200700
200800
200900
201040
201130
201210
201320
201490
201530
201640
201750
2018170
2019211
2020123
2021110
2022223
2023261
20241914
20252119
2026 (through Aug 31, 2026)65

Battery storage

24.2% of the residential solar installs here include battery storage across all years (46 of 190). In the last 24 months the share was 90.9% (30 of 33).

Net metering tariff

Of the 190 installs with a net metering tariff recorded: NEM 1.0 30 (15.8%), NEM 2.0 114 (60.0%), the Net Billing Tariff (often called NEM 3.0) 46 (24.2%). The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Lease, PPA or owned

34.7% of the 190 installs with ownership recorded are third-party owned (a lease or power purchase agreement); the other 124 are recorded as not third-party owned. Ownership types recorded: PPA 46, lease 16, other 4.

Installers by installs in 95458

Installers with a page in this index, most installs in this ZIP first. 60 such installers have at least one install here. 11 more installs were by 10 installer names without a page in this index. 5 were self-installed or had no installer recorded. Counts of connected systems, not a rating.

InstallerInstalls in 95458Last 24 months
V3 Electric224
FREEDOM FOREVER LLC166
BRIGHT OPS1311
Tesla Energy Operations (formerly SolarCity)110
Gold Rush Energy Solutions90
Jonas Energy Solutions90
Bright Planet Solar60
BETTER EARTH ELECTRIC INC50
Complete Solar50
Infinity Energy, Inc50

City and county recorded for 95458

The Service City and Service County the utilities entered on this ZIP’s installs, as recorded. No outside ZIP directory is used.

Recorded asInstalls
City: Lucerne190
County: Lake County190

Common questions

How common are home batteries with solar in 95458?

24.2% of the residential solar installs here include battery storage across all years (46 of 190). In the last 24 months the share was 90.9% (30 of 33).

How many solar installs in 95458 are under NEM 3.0?

46 of the 190 installs here with a tariff recorded (24.2%) were interconnected under the Net Billing Tariff, often called NEM 3.0, which applies to interconnection applications submitted on or after April 15, 2023.

Which solar installers have the most installs in 95458?

Among installers with a page in this index, by installs interconnected here through Aug 31, 2026: V3 Electric (22), FREEDOM FOREVER LLC (16), BRIGHT OPS (13). These are counts of connected systems, not a rating of price, workmanship or service.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.