Home solar in ZIP code 95453, California

Service city recorded on most installs: Lakeport. County: Lake County.

How many homes in ZIP code 95453 have solar?

PG&E, SCE and SDG&E interconnected 896 residential solar systems in ZIP code 95453 through Aug 31, 2026, 96 of them in the last 24 months (Sep 2024 through Aug 2026). The utilities recorded Lakeport, Lake County, as the service city on 896 of them. Tesla Energy Operations (formerly SolarCity) has the most installs recorded in this ZIP, 61.

Counts of interconnected systems from utility records, not a rating of any installer.

Data: California DG Stats interconnection records (Interconnected_Project_Sites_2026-08-31.zip), which run through Aug 31, 2026. ZIP codes are the service ZIP the utility recorded on each project.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

At a glance

Residential solar installs
896
Last 24 months
96 (Sep 2024 through Aug 2026)
Capacity
7,160.3 kW DC
Median system size
7.2 kW DC
Net Billing Tariff (NEM 3.0)
128 installs, 14.3% of those with a tariff recorded
Utility
PGE 896
First install in data
Sep 19, 2002
Latest install in data
Aug 19, 2026

Installs by year

YearInstalls interconnectedWith battery storage
200220
200330
2004160
2005200
200680
200790
2008100
200940
2010140
201170
2012340
2013110
2014310
2015340
2016260
2017480
2018391
2019734
20207116
20216416
202210719
202311414
20247350
20254739
2026 (through Aug 31, 2026)3126

Battery storage

20.6% of the residential solar installs here include battery storage across all years (185 of 896). In the last 24 months the share was 85.4% (82 of 96).

Net metering tariff

Of the 896 installs with a net metering tariff recorded: NEM 1.0 231 (25.8%), NEM 2.0 537 (59.9%), the Net Billing Tariff (often called NEM 3.0) 128 (14.3%). The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Lease, PPA or owned

23.2% of the 896 installs with ownership recorded are third-party owned (a lease or power purchase agreement); the other 688 are recorded as not third-party owned. Ownership types recorded: PPA 151, lease 46, other 11.

Installers by installs in 95453

Installers with a page in this index, most installs in this ZIP first. 127 such installers have at least one install here. 89 more installs were by 43 installer names without a page in this index. 44 were self-installed or had no installer recorded. Counts of connected systems, not a rating.

InstallerInstalls in 95453Last 24 months
Tesla Energy Operations (formerly SolarCity)613
V3 Electric5412
Jonas Energy Solutions444
Complete Solar401
GRID Alternatives360
FREEDOM FOREVER LLC3510
Infinity Energy, Inc310
Sunrun3110
Harmony Air261
BRIGHT OPS2415

City and county recorded for 95453

The Service City and Service County the utilities entered on this ZIP’s installs, as recorded. No outside ZIP directory is used.

Recorded asInstalls
City: Lakeport896
County: Lake County896

Common questions

How common are home batteries with solar in 95453?

20.6% of the residential solar installs here include battery storage across all years (185 of 896). In the last 24 months the share was 85.4% (82 of 96).

How many solar installs in 95453 are under NEM 3.0?

128 of the 896 installs here with a tariff recorded (14.3%) were interconnected under the Net Billing Tariff, often called NEM 3.0, which applies to interconnection applications submitted on or after April 15, 2023.

Which solar installers have the most installs in 95453?

Among installers with a page in this index, by installs interconnected here through Aug 31, 2026: Tesla Energy Operations (formerly SolarCity) (61), V3 Electric (54), Jonas Energy Solutions (44). These are counts of connected systems, not a rating of price, workmanship or service.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.