Home solar in ZIP code 93210, California

Service city recorded on most installs: Coalinga. County: Fresno County.

How many homes in ZIP code 93210 have solar?

PG&E, SCE and SDG&E interconnected 1,272 residential solar systems in ZIP code 93210 through Aug 31, 2026, 177 of them in the last 24 months (Sep 2024 through Aug 2026). The utilities recorded Coalinga, Fresno County, as the service city on 1,270 of them. Sunrun has the most installs recorded in this ZIP, 387.

Counts of interconnected systems from utility records, not a rating of any installer.

Data: California DG Stats interconnection records (Interconnected_Project_Sites_2026-08-31.zip), which run through Aug 31, 2026. ZIP codes are the service ZIP the utility recorded on each project.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

At a glance

Residential solar installs
1,272
Last 24 months
177 (Sep 2024 through Aug 2026)
Capacity
9,024.6 kW DC
Median system size
6.6 kW DC
Net Billing Tariff (NEM 3.0)
261 installs, 20.5% of those with a tariff recorded
Utility
PGE 1,272
First install in data
Oct 11, 2004
Latest install in data
Aug 31, 2026

Installs by year

YearInstalls interconnectedWith battery storage
200410
200510
200600
200730
200810
200910
201020
201140
201290
2013170
2014420
2015660
2016760
2017750
20181271
2019901
20201090
2021902
20221466
202316319
202411295
202510795
2026 (through Aug 31, 2026)3029

Battery storage

19.5% of the residential solar installs here include battery storage across all years (248 of 1,272). In the last 24 months the share was 92.1% (163 of 177).

Net metering tariff

Of the 1,272 installs with a net metering tariff recorded: NEM 1.0 226 (17.8%), NEM 2.0 785 (61.7%), the Net Billing Tariff (often called NEM 3.0) 261 (20.5%). The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Lease, PPA or owned

48.0% of the 1,272 installs with ownership recorded are third-party owned (a lease or power purchase agreement); the other 662 are recorded as not third-party owned. Ownership types recorded: PPA 481, lease 122, prepaid lease 1, other 6.

Installers by installs in 93210

Installers with a page in this index, most installs in this ZIP first. 131 such installers have at least one install here. 18 more installs were by 14 installer names without a page in this index. 9 were self-installed or had no installer recorded. Counts of connected systems, not a rating.

InstallerInstalls in 93210Last 24 months
Sunrun38788
Tesla Energy Operations (formerly SolarCity)1664
Vivint Solar Developer, LLC540
Bright Planet Solar390
SunPower360
Quality Home Services343
FREEDOM FOREVER LLC301
PetersenDean290
BRIGHT OPS2723
Empower Electric Solar268

City and county recorded for 93210

The Service City and Service County the utilities entered on this ZIP’s installs, as recorded. No outside ZIP directory is used.

Recorded asInstalls
City: Coalinga1,270
County: Fresno County1,272

1 other city value on 2 installs, each under 1% of this ZIP’s installs, are not listed.

Common questions

How common are home batteries with solar in 93210?

19.5% of the residential solar installs here include battery storage across all years (248 of 1,272). In the last 24 months the share was 92.1% (163 of 177).

How many solar installs in 93210 are under NEM 3.0?

261 of the 1,272 installs here with a tariff recorded (20.5%) were interconnected under the Net Billing Tariff, often called NEM 3.0, which applies to interconnection applications submitted on or after April 15, 2023.

Which solar installers have the most installs in 93210?

Among installers with a page in this index, by installs interconnected here through Aug 31, 2026: Sunrun (387), Tesla Energy Operations (formerly SolarCity) (166), Vivint Solar Developer, LLC (54). These are counts of connected systems, not a rating of price, workmanship or service.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.