How many homes in ZIP code 90805 have solar?
PG&E, SCE and SDG&E interconnected 1,863 residential solar systems in ZIP code 90805 through Aug 31, 2026, 331 of them in the last 24 months (Sep 2024 through Aug 2026). The utilities recorded Long Beach, Los Angeles County, as the service city on 1,863 of them. Tesla Energy Operations (formerly SolarCity) has the most installs recorded in this ZIP, 255.
Counts of interconnected systems from utility records, not a rating of any installer.
Data: California DG Stats interconnection records (Interconnected_Project_Sites_2026-08-31.zip), which run through Aug 31, 2026. ZIP codes are the service ZIP the utility recorded on each project.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
At a glance
- Residential solar installs
- 1,863
- Last 24 months
- 331 (Sep 2024 through Aug 2026)
- Capacity
- 9,971.1 kW DC
- Median system size
- 4.8 kW DC
- Net Billing Tariff (NEM 3.0)
- 432 installs, 23.2% of those with a tariff recorded
- Utility
- SCE 1,863
- First install in data
- Apr 9, 2004
- Latest install in data
- Aug 17, 2026
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2004 | 3 | 0 |
| 2005 | 1 | 0 |
| 2006 | 0 | 0 |
| 2007 | 0 | 0 |
| 2008 | 2 | 0 |
| 2009 | 2 | 0 |
| 2010 | 8 | 0 |
| 2011 | 7 | 0 |
| 2012 | 19 | 0 |
| 2013 | 35 | 0 |
| 2014 | 64 | 0 |
| 2015 | 185 | 0 |
| 2016 | 217 | 0 |
| 2017 | 113 | 0 |
| 2018 | 76 | 4 |
| 2019 | 84 | 5 |
| 2020 | 85 | 4 |
| 2021 | 119 | 12 |
| 2022 | 154 | 17 |
| 2023 | 253 | 31 |
| 2024 | 160 | 90 |
| 2025 | 178 | 142 |
| 2026 (through Aug 31, 2026) | 98 | 73 |
Battery storage
20.3% of the residential solar installs here include battery storage across all years (378 of 1,863). In the last 24 months the share was 77.0% (255 of 331).
Net metering tariff
Of the 1,863 installs with a net metering tariff recorded: NEM 1.0 606 (32.5%), NEM 2.0 825 (44.3%), the Net Billing Tariff (often called NEM 3.0) 432 (23.2%). The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Lease, PPA or owned
48.0% of the 1,710 installs with ownership recorded are third-party owned (a lease or power purchase agreement); the other 890 are recorded as not third-party owned. Ownership types recorded: PPA 697, lease 98, prepaid lease 1, other 24.
Installers by installs in 90805
Installers with a page in this index, most installs in this ZIP first. 253 such installers have at least one install here. 43 more installs were by 40 installer names without a page in this index. 26 were self-installed or had no installer recorded. Counts of connected systems, not a rating.
| Installer | Installs in 90805 | Last 24 months |
|---|---|---|
| Tesla Energy Operations (formerly SolarCity) | 255 | 10 |
| Sunrun | 220 | 79 |
| Vivint Solar Developer, LLC | 208 | 0 |
| GRID Alternatives | 119 | 3 |
| Bright Planet Solar | 52 | 0 |
| FREEDOM FOREVER LLC | 49 | 11 |
| BRIGHT OPS | 48 | 48 |
| C S S CONSTRUCTION | 46 | 0 |
| ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING | 39 | 11 |
| Complete Solar | 36 | 26 |
City and county recorded for 90805
The Service City and Service County the utilities entered on this ZIP’s installs, as recorded. No outside ZIP directory is used.
| Recorded as | Installs |
|---|---|
| City: Long Beach | 1,863 |
| County: Los Angeles County | 1,863 |
Common questions
How common are home batteries with solar in 90805?
20.3% of the residential solar installs here include battery storage across all years (378 of 1,863). In the last 24 months the share was 77.0% (255 of 331).
How many solar installs in 90805 are under NEM 3.0?
432 of the 1,863 installs here with a tariff recorded (23.2%) were interconnected under the Net Billing Tariff, often called NEM 3.0, which applies to interconnection applications submitted on or after April 15, 2023.
Which solar installers have the most installs in 90805?
Among installers with a page in this index, by installs interconnected here through Aug 31, 2026: Tesla Energy Operations (formerly SolarCity) (255), Sunrun (220), Vivint Solar Developer, LLC (208). These are counts of connected systems, not a rating of price, workmanship or service.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.