Western Sun Systems

How many solar installs has Western Sun Systems done in California, and which license number is on its installs?

Western Sun Systems has 188 residential solar installs interconnected in California, active in the records from 2009 through 2026 (Jan 27, 2009 to May 21, 2026), most of them in Monterey County (172), Santa Cruz County (8) and San Benito County (3). CSLB lists license 962892 (WESTERN SUN SYSTEMS INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-46, expires Jul 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
188
Last 24 months
9
Total capacity
1,586.1 kW DC
Median system size
7.2 kW DC
With battery storage
12.8% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 44.4% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.0% of 188 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
3 installs, latest May 21, 2026
Ownership types recorded
none recorded
Median battery size
11.5 kWh (4 installs list a capacity)
First install
Jan 27, 2009
Latest install
May 21, 2026
Counties
7
Utilities
PGE 187, SDGE 1
CSLB license
962892

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2009 to 2026

YearInstalls interconnectedWith battery storage
200980
201090
2011110
2012130
201360
2014150
2015170
2016140
2017110
2018110
201990
2020101
202160
2022156
2023168
202496
202530
2026 (through Aug 31, 2026)53

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

3 of its 188 interconnected installs (1.6% of the 188 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 66.7% of those include battery storage. The latest Net Billing Tariff install was approved May 21, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.09349.5%not counted
NEM 2.09248.9%22 (23.9%)
Net Billing Tariff31.6%2 (66.7%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Western Sun Systems’s installs. No residential system in the file lists a third-party owner name that matches Western Sun Systems exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 9 of Western Sun Systems’ 9 installs name a module maker in the “Generator Manufacturer” fields, and most of those (5, 55.6%) used modules recorded as REC.

In the last 24 months, 9 of Western Sun Systems’ 9 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (8, 88.9%) used inverters recorded as Enphase.

In the last 24 months, 4 of Western Sun Systems’ 9 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (2, 50.0%) used batteries recorded as Enphase.

20 of 24 battery-paired PG&E and SCE installs (83.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC510
LONGi2not in top list
Solaria217
Inverter makerEnphase851
FranklinWH2not in top list
Sol-Ark14
Battery makerEnphase213
FranklinWH22

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 181 of 188 installs, inverters on 188. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Western Sun Systems as developer on 1 battery storage project and as installer on 2 (1 name it as both), 2 projects in all with 68 kWh of storage. 2 have the status Paid, with $42,734 in current incentive allocations. Applications were received from Feb 4, 2022 to Apr 3, 2023.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid268$42,734

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency139$38,8241$38,824
Small Residential Storage129$3,9101$3,910

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
962892WESTERN SUN SYSTEMS INC (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-46 Solar ContractorJul 6, 2011Jul 31, 2027137

License numbers are the ones the utilities recorded on the interconnection applications (138 of 188 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 962892. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Monterey172
Santa Cruz8
San Benito3
Santa Clara2
Alameda1
Orange1
Sonoma1

Top cities

CityInstalls
Carmel65
Carmel Valley48
Salinas15
Pebble Beach14
Monterey12
Pacific Grove8
Big Sur5
Santa Cruz4
Hollister3
Watsonville3
Aptos1
Emeryville1
Gilroy1
Marina1
Royal Oaks1

Names as recorded by the utilities

The utilities recorded this installer under 7 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Western Sun Systems79
WESTERN SUN SYSTEMS INC74
Western Sun Systems, Inc.21
Western Sun Systems, Inc9
Western Sun Systems Inc3
Western Sun Systems, INc1
Western Sun Systems.1

Common questions

Where does Western Sun Systems install solar?

Its installs are spread across 7 counties. The most are in Monterey County (172 installs), followed by Santa Cruz County (8).

How often does Western Sun Systems install batteries with solar?

12.8% of its interconnected solar installs include battery storage across all years, and 44.4% in the last 24 months (4 of 9). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Western Sun Systems installs are under NEM 3.0 (the Net Billing Tariff)?

3 of its 188 interconnected installs (1.6% of the 188 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 66.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources