VIVA ENERGY

How many solar installs has VIVA ENERGY done in California, and which license number is on its installs?

VIVA ENERGY has 50 residential solar installs interconnected in California, active in the records from 2025 through 2026 (Apr 14, 2025 to Aug 27, 2026), most of them in Fresno County (22), San Luis Obispo County (10) and Kern County (6). CSLB lists license 1110302 (VIVA ENERGY) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-46, expires Sep 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
50
Last 24 months
50
Total capacity
461.8 kW DC
Median system size
8.1 kW DC
With battery storage
94.0% all time; 94.0% last 24 months
Third-party owned
0.0% of 50 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
45 installs, latest Aug 27, 2026
Ownership types recorded
none recorded
Median battery size
7.8 kWh (44 installs list a capacity)
First install
Apr 14, 2025
Latest install
Aug 27, 2026
Counties
7
Utilities
PGE 43, SCE 7
CSLB license
1110302

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2025 to 2026

YearInstalls interconnectedWith battery storage
20253028
2026 (through Aug 31, 2026)2019

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

45 of its 50 interconnected installs (90.0% of the 50 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 93.3% of those include battery storage. The latest Net Billing Tariff install was approved Aug 27, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.012.0%not counted
NEM 2.048.0%4 (100.0%)
Net Billing Tariff4590.0%42 (93.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on VIVA ENERGY’s installs. No residential system in the file lists a third-party owner name that matches VIVA ENERGY exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 50 of VIVA ENERGY’s 50 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (21, 42.0%) used modules recorded as REC.

In the last 24 months, 50 of VIVA ENERGY’s 50 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (31, 62.0%) used inverters recorded as Tesla.

In the last 24 months, 27 of VIVA ENERGY’s 50 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (25, 92.6%) used batteries recorded as Tesla.

27 of 47 battery-paired PG&E and SCE installs (57.4%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC2121
Qcells2020
JA Solar55
EG433
Sharp33
Inverter makerTesla3131
Qcells1414
Enphase44
SMA44
EG433
Battery makerTesla2525
Enphase11
FranklinWH11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 50 of 50 installs, inverters on 50. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1110302VIVA ENERGY (Corporation)CLEARB General Building Contractor; C-46 Solar ContractorSep 19, 2023Sep 30, 202750

License numbers are the ones the utilities recorded on the interconnection applications (50 of 50 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1110302. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Fresno22
San Luis Obispo10
Kern6
Tulare6
Madera4
Kings1
Santa Barbara1

Top cities

CityInstalls
Fresno11
Clovis5
Visalia5
Bakersfield4
Los Osos4
Sanger4
Paso Robles3
Coarsegold2
Armona1
Arroyo Grande1
Auberry1
Delano1
Madera1
Morro Bay1
Oakhurst1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
VIVA ENERGY50

Common questions

Where does VIVA ENERGY install solar?

Its installs are spread across 7 counties. The most are in Fresno County (22 installs), followed by San Luis Obispo County (10).

How often does VIVA ENERGY install batteries with solar?

94.0% of its interconnected solar installs include battery storage across all years, and 94.0% in the last 24 months (47 of 50).

How many VIVA ENERGY installs are under NEM 3.0 (the Net Billing Tariff)?

45 of its 50 interconnected installs (90.0% of the 50 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 93.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.