How many solar installs has Turn Key Construction, Inc done in California, and which license number is on its installs?

Turn Key Construction, Inc has 225 residential solar installs interconnected in California, active in the records from 2014 through 2019 (Jul 3, 2014 to Oct 16, 2019), most of them in Fresno County (174), Madera County (26) and Tulare County (12). CSLB lists license 991046 (TURNKEY ENERGY) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-7, C-10, expires Mar 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
225
Last 24 months
0
Total capacity
1,895 kW DC
Median system size
8 kW DC
With battery storage
0.4% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 225 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
Median battery size
9.8 kWh (1 installs list a capacity)
First install
Jul 3, 2014
Latest install
Oct 16, 2019
Counties
10
Utilities
PGE 213, SCE 12
CSLB license
991046

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
201440
2015290
2016310
2017660
2018581
2019370
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 225 interconnected installs with a tariff recorded (225) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.06830.2%not counted
NEM 2.015769.8%1 (0.6%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Turn Key Construction, Inc’s installs. No residential system in the file lists a third-party owner name that matches Turn Key Construction, Inc exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 223 of Turn Key Construction, Inc’s 225 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (76, 34.1%) used modules recorded as Canadian Solar.

Across all years, 224 of Turn Key Construction, Inc’s 225 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (211, 94.2%) used inverters recorded as Enphase.

Across all years, 1 of Turn Key Construction, Inc’s 225 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as LG.

1 of 1 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar076
SolarWorld060
Qcells053
LG012
Mission Solar011
Inverter makerEnphase0211
APsystems (Altenergy Power System)06
SMA04
SolarEdge04
Battery makerLG01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 223 of 225 installs, inverters on 224. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
991046TURNKEY ENERGY (Corporation)CLEARB General Building Contractor; C-7; C-10 Electrical ContractorMar 5, 2014Mar 31, 2028223

License numbers are the ones the utilities recorded on the interconnection applications (225 of 225 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 991046. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Turn Key Construction, Inc’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense202120222023Total
unincorporated San Diego County9910461113

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Fresno174
Madera26
Tulare12
Tehama4
Contra Costa2
Kings2
San Joaquin2
Kern1
San Luis Obispo1
Tuolumne1

Top cities

CityInstalls
Fresno120
Clovis46
Madera12
North Fork10
Tulare6
Sanger4
Visalia4
Coarsegold3
Gerber2
Hanford2
Kingsburg2
Red Bluff2
Bakersfield1
Concord1
Dinuba1

Names as recorded by the utilities

The utilities recorded this installer under 20 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Turn Key Construction, Inc145
TURN KEY CONSTRUCTION INC25
TURN KEY CONSTRUCTION, INC14
Turn Key Construction, Inc.14
Turn Key Construction Inc4
TURN KEY CONSTRUCTION, INC.4
Turn Key Construction,Inc.3
TURN KEY CONSTRUCTION2
TURN KEY CONSTRUCTION INC.2
Turn Key Construction, INC2
Turn - Key Construction Inc1
Turn - Key Construction Inc.1
Turn Key Construction1
Turn Key construction Inc1
Turn Key Construction Inc.1
Turn key Construction, Inc.1
Turn-Key Construction1
Turn-Key Construction inc1
Turn-Key Construction, Inc.1
Turn-Key Construction. INC1

Common questions

Where does Turn Key Construction, Inc install solar?

Its installs are spread across 10 counties. The most are in Fresno County (174 installs), followed by Madera County (26).

How often does Turn Key Construction, Inc install batteries with solar?

0.4% of its interconnected solar installs include battery storage across all years.

How many Turn Key Construction, Inc installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 225 interconnected installs with a tariff recorded (225) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.