TREEIUM ENERGY INC has 221 residential solar installs interconnected in California, active in the records from 2019 through 2025 (Jan 28, 2019 to Jun 13, 2025), most of them in Los Angeles County (104), Orange County (77) and Ventura County (22). The license number recorded on most of its installs, 1041599, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
221
Last 24 months
3
Total capacity
1,752.6 kW DC
Median system size
7.2 kW DC
With battery storage
26.7% all time; 66.7% last 24 months
Third-party owned
0.0% of 221 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
Median battery size
13.5 kWh (58 installs list a capacity)
First install
Jan 28, 2019
Latest install
Jun 13, 2025
Counties
7
Utilities
SCE 219, PGE 2
CSLB license
1041599

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
2019405
20206620
2021423
20225117
20231711
202443
202510
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 221 interconnected installs with a tariff recorded (221) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.0221100.0%59 (26.7%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on TREEIUM ENERGY INC’s installs. No residential system in the file lists a third-party owner name that matches TREEIUM ENERGY INC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 2 of TREEIUM ENERGY INC’s 3 installs name a module maker in the “Generator Manufacturer” fields, and most of those (2, 100.0%) used modules recorded as REC.

In the last 24 months, 3 of TREEIUM ENERGY INC’s 3 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (2, 66.7%) used inverters recorded as Enphase.

In the last 24 months, none of TREEIUM ENERGY INC’s 3 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

49 of 59 battery-paired PG&E and SCE installs (83.1%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC294
SolarEdge1not in top list
Inverter makerEnphase255
SolarEdge1144
Battery makerTesla038
SolarEdge07
Enphase02
LG01
Storz01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 211 of 221 installs, inverters on 221. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names TREEIUM ENERGY INC as developer on 168 battery storage projects and as installer on 155 (154 name it as both), 169 projects in all with 3,427 kWh of storage. 68 have the status Paid, with $288,602 in current incentive allocations. Applications were received from Jan 21, 2019 to Feb 12, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid681,205$288,602
Cancelled982,190$523,564
RRF Rejected332$4,621

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage1372,352$462,60661$214,010
Large-Scale Storage21841$179,5475$37,977
Equity Resiliency7175$149,4012$36,616
Residential Storage Equity126$20,6120$0
Not stated332$4,6210$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1041599Not found in the CSLB License Master file pulled Nov 4, 2026221

License numbers are the ones the utilities recorded on the interconnection applications (221 of 221 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Los Angeles104
Orange77
Ventura22
Riverside8
San Bernardino8
Alameda1
Kern1

Top cities

CityInstalls
Buena Park9
Irvine9
Long Beach9
Costa Mesa8
Huntington Beach8
Thousand Oaks8
Santa Ana7
Torrance6
La Canada5
La Habra5
Rancho Palos Verdes5
Redondo Beach5
Culver City4
Fullerton4
Simi Valley4

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
TREEIUM ENERGY INC219
Treeium energy2

Common questions

Where does TREEIUM ENERGY INC install solar?

Its installs are spread across 7 counties. The most are in Los Angeles County (104 installs), followed by Orange County (77).

How often does TREEIUM ENERGY INC install batteries with solar?

26.7% of its interconnected solar installs include battery storage across all years, and 66.7% in the last 24 months (2 of 3).

How many TREEIUM ENERGY INC installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 221 interconnected installs with a tariff recorded (221) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.