TRANSFORM POWER

How many solar installs has TRANSFORM POWER done in California, and which license number is on its installs?

TRANSFORM POWER has 130 residential solar installs interconnected in California, active in the records from 2020 through 2026 (Jan 31, 2020 to Aug 14, 2026), most of them in Riverside County (119), San Diego County (8) and Orange County (1). CSLB lists license 1053266 (TRANSFORM POWER) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires May 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
130
Last 24 months
50
Total capacity
1,311.7 kW DC
Median system size
9.9 kW DC
With battery storage
40.5% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 97.8% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
2.3% of 130 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
45 installs, latest Aug 14, 2026
Ownership types recorded
PPA 2, prepaid lease 1
Median battery size
13.5 kWh (49 installs list a capacity)
First install
Jan 31, 2020
Latest install
Aug 14, 2026
Counties
5
Utilities
SCE 120, SDGE 9, PGE 1
CSLB license
1053266

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2020 to 2026

YearInstalls interconnectedWith battery storage
2020180
2021191
2022171
2023210
202463
20253533
2026 (through Aug 31, 2026)1411

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

45 of its 130 interconnected installs (34.6% of the 130 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 97.6% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 14, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.08565.4%9 (11.3%)
Net Billing Tariff4534.6%40 (97.6%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 3 of TRANSFORM POWER’s installs the utility recorded a third-party ownership type: PPA 2, lease 0, prepaid lease 1, other 0. No residential system in the file lists a third-party owner name that matches TRANSFORM POWER exactly.

Third-party owner named on its installsInstalls
HDM2
Medallion Bank1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 49 of TRANSFORM POWER’s 50 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (14, 28.6%) used modules recorded as REC.

In the last 24 months, 50 of TRANSFORM POWER’s 50 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (34, 68.0%) used inverters recorded as Tesla.

In the last 24 months, 44 of TRANSFORM POWER’s 50 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (40, 90.9%) used batteries recorded as Tesla.

48 of 49 battery-paired PG&E and SCE installs (98.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC1425
Aptos Solar1212
Qcells662
SEG Solar5not in top list
LONGi3not in top list
Inverter makerTesla3438
Enphase1239
SolarEdge444
PointGuard Energy Inc.1not in top list
PointGuardEnergyInc.1not in top list
Battery makerTesla4040
Enphase46

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 128 of 130 installs, inverters on 130. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names TRANSFORM POWER as developer on 7 battery storage projects and as installer on 7 (7 name it as both), 7 projects in all with 107 kWh of storage. 3 have the status Paid, with $54,600 in current incentive allocations. Applications were received from Jun 12, 2025 to Nov 3, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid355$54,600
Reserved453$59,525

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency468$67,8003$54,600
Residential Solar and Storage Equity - Ratepayer226$26,3200$0
Residential Solar and Storage Equity - AB 209 Non-POU113$20,0050$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1053266TRANSFORM POWER (Corporation)CLEARB General Building Contractor; C-10 Electrical ContractorMay 8, 2019May 31, 2027130

License numbers are the ones the utilities recorded on the interconnection applications (130 of 130 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1053266. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list TRANSFORM POWER’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20212023202420252026Total
unincorporated San Diego County1053266111126

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Riverside119
San Diego8
Orange1
San Bernardino1
San Luis Obispo1

Top cities

CityInstalls
Temecula58
Murrieta24
Menifee8
Hemet7
Wildomar6
Nuevo3
San Jacinto3
Winchester3
Escondido2
Fallbrook2
Lake Elsinore2
San Diego2
Sun City2
Canyon Lake1
Pauma Valley1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
TRANSFORM POWER121
Transform Power9

Common questions

Where does TRANSFORM POWER install solar?

Its installs are spread across 5 counties. The most are in Riverside County (119 installs), followed by San Diego County (8).

How often does TRANSFORM POWER install batteries with solar?

40.5% of its interconnected solar installs include battery storage across all years, and 97.8% in the last 24 months (45 of 46). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many TRANSFORM POWER installs are under NEM 3.0 (the Net Billing Tariff)?

45 of its 130 interconnected installs (34.6% of the 130 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 97.6% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.