Sunside Solar Inc

How many solar installs has Sunside Solar Inc done in California, and which license number is on its installs?

Sunside Solar Inc has 204 residential solar installs interconnected in California, active in the records from 2013 through 2026 (Mar 25, 2013 to Aug 12, 2026), most of them in Los Angeles County (193), San Bernardino County (6) and Orange County (4). CSLB lists license 995897 (SUNSIDE SOLAR INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Aug 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
204
Last 24 months
68
Total capacity
1,160.6 kW DC
Median system size
4.6 kW DC
With battery storage
0.0% all time; 0.0% last 24 months
Third-party owned
0.5% of 196 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
49 installs, latest Aug 12, 2026
Ownership types recorded
PPA 1
First install
Mar 25, 2013
Latest install
Aug 12, 2026
Counties
4
Utilities
SCE 204
CSLB license
995897

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2013 to 2026

YearInstalls interconnectedWith battery storage
201310
201420
2015180
2016100
2017130
2018150
201970
202070
202140
2022130
2023170
2024500
2025300
2026 (through Aug 31, 2026)170

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

49 of its 204 interconnected installs (24.0% of the 204 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Aug 12, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.03517.2%not counted
NEM 2.012058.8%0 (0.0%)
Net Billing Tariff4924.0%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 1 of Sunside Solar Inc’s installs the utility recorded a third-party ownership type: PPA 1, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Sunside Solar Inc exactly.

Third-party owner named on its installsInstalls
Sunrun Inc1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 62 of Sunside Solar Inc’s 68 installs name a module maker in the “Generator Manufacturer” fields, and most of those (39, 62.9%) used modules recorded as Canadian Solar.

In the last 24 months, 68 of Sunside Solar Inc’s 68 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (65, 95.6%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar3996
LONGi1515
REC25
SEG Solar2not in top list
Aptos Solar1not in top list
Inverter makerEnphase65162
SolarEdge328

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 189 of 204 installs, inverters on 204. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
995897SUNSIDE SOLAR INC (Corporation)CLEARB General Building ContractorAug 19, 2014Aug 31, 2028202

License numbers are the ones the utilities recorded on the interconnection applications (203 of 204 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 995897. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Los Angeles193
San Bernardino6
Orange4
Riverside1

Top cities

CityInstalls
Arcadia69
Temple City21
Monrovia11
Alhambra10
San Marino7
Hacienda Heights6
Monterey Park6
Pasadena6
Rosemead6
Walnut6
El Monte5
San Dimas5
Glendora4
West Covina4
Claremont3

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SUNSIDE SOLAR INC175
Sunside Solar Inc29

Common questions

Where does Sunside Solar Inc install solar?

Its installs are spread across 4 counties. The most are in Los Angeles County (193 installs), followed by San Bernardino County (6).

How often does Sunside Solar Inc install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 68).

How many Sunside Solar Inc installs are under NEM 3.0 (the Net Billing Tariff)?

49 of its 204 interconnected installs (24.0% of the 204 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.