Sun Solar Energy

How many solar installs has Sun Solar Energy done in California, and which license number is on its installs?

Sun Solar Energy has 44 residential solar installs interconnected in California, active in the records from 2012 through 2015 (Jan 26, 2012 to May 14, 2015), most of them in Orange County (15), Kern County (8) and Riverside County (8). The license number recorded on most of its installs, 974930, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
44
Last 24 months
0
Total capacity
388.9 kW DC
Median system size
7.4 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
83.3% of 6 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
lease 5
First install
Jan 26, 2012
Latest install
May 14, 2015
Counties
6
Utilities
SCE 43, PGE 1
CSLB license
974930

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2012 to 2026

YearInstalls interconnectedWith battery storage
201210
201320
2014230
2015180
201600
201700
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 44 interconnected installs with a tariff recorded (44) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.044100.0%not counted
NEM 2.000.0%0
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 5 of Sun Solar Energy’s installs the utility recorded a third-party ownership type: PPA 0, lease 5, prepaid lease 0, other 0. Across all installers, 1 residential systems list a third-party owner name that matches Sun Solar Energy exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
SunPower Capital LLC4
SunPower Capitral LLC1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 1 of Sun Solar Energy’s 44 installs name a module maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used modules recorded as SunPower.

Across all years, 44 of Sun Solar Energy’s 44 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (16, 36.4%) used inverters recorded as SolarEdge.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSunPower01
Inverter makerSolarEdge016
SMA010
SunPower08
Fronius05
Enphase03

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 1 of 44 installs, inverters on 44. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
974930Not found in the CSLB License Master file pulled Nov 4, 202643

License numbers are the ones the utilities recorded on the interconnection applications (43 of 44 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Other names reported under the same license

Counties

CountyInstalls
Orange15
Kern8
Riverside8
Tulare6
Los Angeles5
San Bernardino2

Top cities

CityInstalls
Corona4
Santa Ana4
Tehachapi4
Delano3
Norco3
Visalia3
Yorba Linda3
Chino Hills2
Diamond Bar2
Los Alamitos2
Porterville2
Tustin2
Bakersfield1
Foothill Ranch1
Huntington Beach1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Sun Solar Energy23
SUN SOLAR ENERGY21

Common questions

Where does Sun Solar Energy install solar?

Its installs are spread across 6 counties. The most are in Orange County (15 installs), followed by Kern County (8).

How often does Sun Solar Energy install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Sun Solar Energy installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 44 interconnected installs with a tariff recorded (44) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.