SOLAR INSPECTION GROUP
How many solar installs has SOLAR INSPECTION GROUP done in California, and which license number is on its installs?
SOLAR INSPECTION GROUP has 43 residential solar installs interconnected in California, active in the records from 2021 through 2026 (Mar 25, 2021 to Mar 6, 2026), most of them in Los Angeles County (21), Riverside County (13) and Orange County (4). The license number recorded on most of its installs, 841332, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 43
- Last 24 months
- 7
- Total capacity
- 424.1 kW DC
- Median system size
- 8.5 kW DC
- With battery storage
- 7.0% all time; 0.0% last 24 months
- Third-party owned
- 0.0% of 43 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 0 installs
- Ownership types recorded
- none recorded
- Median battery size
- 9.8 kWh (3 installs list a capacity)
- First install
- Mar 25, 2021
- Latest install
- Mar 6, 2026
- Counties
- 5
- Utilities
- SCE 43
- CSLB license
- 841332
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2021 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2021 | 2 | 1 |
| 2022 | 4 | 1 |
| 2023 | 27 | 1 |
| 2024 | 8 | 0 |
| 2025 | 1 | 0 |
| 2026 (through Aug 31, 2026) | 1 | 0 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
None of its 43 interconnected installs with a tariff recorded (43) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 0 | 0.0% | not counted |
| NEM 2.0 | 43 | 100.0% | 3 (7.0%) |
| Net Billing Tariff | 0 | 0.0% | 0 |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
The utilities recorded no third-party ownership type (PPA or lease) on SOLAR INSPECTION GROUP’s installs. No residential system in the file lists a third-party owner name that matches SOLAR INSPECTION GROUP exactly.
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 7 of SOLAR INSPECTION GROUP’s 7 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (3, 42.9%) used modules recorded as Canadian Solar.
In the last 24 months, 7 of SOLAR INSPECTION GROUP’s 7 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (4, 57.1%) used inverters recorded as Enphase.
In the last 24 months, none of SOLAR INSPECTION GROUP’s 7 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.
1 of 3 battery-paired PG&E and SCE installs (33.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Canadian Solar | 3 | 25 |
| VSUN (Vietnam Sunergy) | 3 | 9 | |
| Qcells | 1 | 2 | |
| Inverter maker | Enphase | 4 | 19 |
| SMA | 2 | 2 | |
| SolarEdge | 1 | 15 | |
| Battery maker | LG | 0 | 1 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 42 of 43 installs, inverters on 43. See the methodology and the equipment index.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 841332 | Not found in the CSLB License Master file pulled Nov 4, 2026 | 43 | ||||
License numbers are the ones the utilities recorded on the interconnection applications (43 of 43 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.
Counties
| County | Installs |
|---|---|
| Los Angeles | 21 |
| Riverside | 13 |
| Orange | 4 |
| San Bernardino | 4 |
| Ventura | 1 |
Top cities
| City | Installs |
|---|---|
| Long Beach | 3 |
| Chino Hills | 2 |
| Corona | 2 |
| Diamond Bar | 2 |
| Hacienda Heights | 2 |
| Irvine | 2 |
| Jurupa Valley | 2 |
| Lake Elsinore | 2 |
| Norco | 2 |
| Sun City | 2 |
| Temple City | 2 |
| Bellflower | 1 |
| Brea | 1 |
| Chino | 1 |
| Claremont | 1 |
Names as recorded by the utilities
The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| SOLAR INSPECTION GROUP | 43 |
Common questions
Where does SOLAR INSPECTION GROUP install solar?
Its installs are spread across 5 counties. The most are in Los Angeles County (21 installs), followed by Riverside County (13).
How often does SOLAR INSPECTION GROUP install batteries with solar?
7.0% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 7).
How many SOLAR INSPECTION GROUP installs are under NEM 3.0 (the Net Billing Tariff)?
None of its 43 interconnected installs with a tariff recorded (43) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.