SOLAR FREEDOM USA

How many solar installs has SOLAR FREEDOM USA done in California, and which license number is on its installs?

SOLAR FREEDOM USA has 219 residential solar installs interconnected in California, active in the records from 2018 through 2026 (Oct 13, 2018 to Aug 25, 2026), most of them in Los Angeles County (209), Orange County (6) and Riverside County (2). CSLB lists license 1068445 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-46, expires Sep 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
219
Last 24 months
130
Total capacity
1,522.4 kW DC
Median system size
5.3 kW DC
With battery storage
50.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 51.2% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.5% of 219 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
169 installs, latest Aug 25, 2026
Ownership types recorded
PPA 1
Median battery size
16 kWh (108 installs list a capacity)
First install
Oct 13, 2018
Latest install
Aug 25, 2026
Counties
4
Utilities
SCE 216, SDGE 3
CSLB license
1068445

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2018 to 2026

YearInstalls interconnectedWith battery storage
201811
201911
202010
202144
2022129
20233118
20245114
20256231
2026 (through Aug 31, 2026)5630

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

169 of its 219 interconnected installs (77.2% of the 219 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 45.2% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 25, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.05022.8%32 (66.7%)
Net Billing Tariff16977.2%76 (45.2%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 1 of SOLAR FREEDOM USA’s installs the utility recorded a third-party ownership type: PPA 1, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches SOLAR FREEDOM USA exactly.

Third-party owner named on its installsInstalls
SunRun1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 130 of SOLAR FREEDOM USA’s 130 installs name a module maker in the “Generator Manufacturer” fields, and most of those (94, 72.3%) used modules recorded as Philadelphia Solar.

In the last 24 months, 130 of SOLAR FREEDOM USA’s 130 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (56, 43.1%) used inverters recorded as EG4.

In the last 24 months, 29 of SOLAR FREEDOM USA’s 130 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (20, 69.0%) used batteries recorded as LG.

69 of 108 battery-paired PG&E and SCE installs (63.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerPhiladelphia Solar94104
EG43737
Canadian Solar3177
REC35
JA Solar1not in top list
Inverter makerEG45656
SolarEdge4491
Enphase2550
Tesla69
Battery makerLG2060
Tesla66
EG433

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 218 of 219 installs, inverters on 219. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names SOLAR FREEDOM USA as developer on 68 battery storage projects and as installer on 38 (38 name it as both), 68 projects in all with 1,267 kWh of storage. 55 have the status Paid, with $197,249 in current incentive allocations. Applications were received from Feb 2, 2019 to Dec 1, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid55879$197,249
Reserved3236$56,087
Cancelled10152$39,843

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage56869$145,96048$125,157
Equity Resiliency6103$64,5686$64,568
Large-Scale Storage6296$82,6511$7,524

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1068445Sole owner license (name not shown)CLEARB General Building Contractor; C-10 Electrical Contractor; C-46 Solar ContractorSep 2, 2020Sep 30, 2028216

License numbers are the ones the utilities recorded on the interconnection applications (219 of 219 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1068445. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Los Angeles209
Orange6
Riverside2
San Bernardino2

Top cities

CityInstalls
Redondo Beach98
Manhattan Beach22
Torrance17
Palos Verdes Estates14
Lynwood12
Rancho Palos Verdes9
El Segundo5
Hermosa Beach5
Rolling Hills Estates5
Lawndale4
Long Beach4
Lakewood2
Baldwin Park1
Carson1
Corona1

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SOLAR FREEDOM USA199
solar freedom usa17
Solar Freedom USA3

Common questions

Where does SOLAR FREEDOM USA install solar?

Its installs are spread across 4 counties. The most are in Los Angeles County (209 installs), followed by Orange County (6).

How often does SOLAR FREEDOM USA install batteries with solar?

50.0% of its interconnected solar installs include battery storage across all years, and 51.2% in the last 24 months (66 of 129). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many SOLAR FREEDOM USA installs are under NEM 3.0 (the Net Billing Tariff)?

169 of its 219 interconnected installs (77.2% of the 219 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 45.2% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.