How many solar installs has Solar Forward Electric, INC. done in California, and which license number is on its installs?

Solar Forward Electric, INC. has 209 residential solar installs interconnected in California, active in the records from 2015 through 2026 (Jun 18, 2015 to Jul 20, 2026), most of them in Los Angeles County (193), Ventura County (9) and Orange County (5). CSLB lists license 994683 (SOLAR FORWARD ELECTRIC INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Jul 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
209
Last 24 months
20
Total capacity
1,870.4 kW DC
Median system size
6.3 kW DC
With battery storage
34.4% all time; 25.0% last 24 months
Third-party owned
1.9% of 209 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
17 installs, latest Jul 20, 2026
Ownership types recorded
PPA 1, lease 3
Median battery size
27 kWh (71 installs list a capacity)
First install
Jun 18, 2015
Latest install
Jul 20, 2026
Counties
5
Utilities
SCE 207, PGE 2
CSLB license
994683

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2015 to 2026

YearInstalls interconnectedWith battery storage
2015210
2016190
2017160
2018204
20192919
20202115
2021175
2022179
2023134
20241913
2025121
2026 (through Aug 31, 2026)52

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

17 of its 209 interconnected installs (8.1% of the 209 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 35.3% of those include battery storage. The latest Net Billing Tariff install was approved Jul 20, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.07033.5%not counted
NEM 2.012258.4%47 (38.5%)
Net Billing Tariff178.1%6 (35.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 4 of Solar Forward Electric, INC.’s installs the utility recorded a third-party ownership type: PPA 1, lease 3, prepaid lease 0, other 0. Across all installers, 2 residential systems list a third-party owner name that matches Solar Forward Electric, INC. exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Solar Forward Electric, INC.2
HERO1
SunPower Corporation Systems1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 20 of Solar Forward Electric, INC.’s 20 installs name a module maker in the “Generator Manufacturer” fields, and most of those (20, 100.0%) used modules recorded as SunPower.

In the last 24 months, 20 of Solar Forward Electric, INC.’s 20 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (11, 55.0%) used inverters recorded as SunPower.

In the last 24 months, 5 of Solar Forward Electric, INC.’s 20 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (5, 100.0%) used batteries recorded as Tesla.

71 of 72 battery-paired PG&E and SCE installs (98.6%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSunPower20196
Inverter makerSunPower11100
Enphase938
Tesla1not in top list
Battery makerTesla571

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 204 of 209 installs, inverters on 209. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Solar Forward Electric, INC. as developer on 235 battery storage projects and as installer on 50 (49 name it as both), 236 projects in all with 6,431 kWh of storage. 139 have the status Paid, with $873,113 in current incentive allocations. Applications were received from May 1, 2017 to Nov 8, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid1393,550$873,113
Reserved4145$24,453
Cancelled872,603$686,597
RRF Rejected6132$23,200

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage1894,530$1,056,131128$727,033
Large-Scale Storage341,562$350,1578$75,400
Equity Resiliency7206$177,8753$70,680
Not stated6132$23,2000$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
994683SOLAR FORWARD ELECTRIC INC (Corporation)CLEARC-10 Electrical ContractorJul 15, 2014Jul 31, 2028176

License numbers are the ones the utilities recorded on the interconnection applications (177 of 209 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 994683. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles193
Ventura9
Orange5
San Luis Obispo1
Yolo1

Top cities

CityInstalls
Santa Monica84
Malibu32
Redondo Beach16
Manhattan Beach8
Topanga6
Beverly Hills5
Culver City5
Torrance5
El Segundo3
Ojai3
Rancho Palos Verdes3
Simi Valley3
South Pasadena3
Altadena2
Glendora2

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SOLAR FORWARD ELECTRIC INC155
Solar Forward Electric, INC.45
Solar Forward Electric6
Solar Forward Electric, Inc.2
Solar Forward Electric INC.1

Common questions

Where does Solar Forward Electric, INC. install solar?

Its installs are spread across 5 counties. The most are in Los Angeles County (193 installs), followed by Ventura County (9).

How often does Solar Forward Electric, INC. install batteries with solar?

34.4% of its interconnected solar installs include battery storage across all years, and 25.0% in the last 24 months (5 of 20).

How many Solar Forward Electric, INC. installs are under NEM 3.0 (the Net Billing Tariff)?

17 of its 209 interconnected installs (8.1% of the 209 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 35.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.