Solar Ease, Inc. has 182 residential solar installs interconnected in California, active in the records from 2013 through 2024 (Sep 13, 2013 to Sep 5, 2024), most of them in Santa Clara County (166), Contra Costa County (6) and San Mateo County (5). The license number recorded on most of its installs, 992302, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
182
Last 24 months
1
Total capacity
1,401.2 kW DC
Median system size
7.1 kW DC
With battery storage
3.3% all time; 0.0% last 24 months
Third-party owned
0.0% of 182 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
2 installs, latest Jul 10, 2024
Ownership types recorded
none recorded
First install
Sep 13, 2013
Latest install
Sep 5, 2024
Counties
7
Utilities
PGE 181, SCE 1
CSLB license
992302

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2013 to 2026

YearInstalls interconnectedWith battery storage
201340
2014150
2015150
2016260
2017180
2018180
2019160
2020100
2021161
2022170
2023223
202452
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

2 of its 182 interconnected installs (1.1% of the 182 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The latest Net Billing Tariff install was approved Jul 10, 2024.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.06133.5%not counted
NEM 2.011965.4%4 (3.4%)
Net Billing Tariff21.1%2 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Solar Ease, Inc.’s installs. No residential system in the file lists a third-party owner name that matches Solar Ease, Inc. exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 1 of Solar Ease, Inc.’s 1 installs name a module maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used modules recorded as REC.

In the last 24 months, 1 of Solar Ease, Inc.’s 1 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (1, 100.0%) used inverters recorded as Enphase.

In the last 24 months, none of Solar Ease, Inc.’s 1 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

6 of 6 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC117
Inverter makerEnphase1181
Battery makerEnphase06

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 180 of 182 installs, inverters on 182. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
992302Not found in the CSLB License Master file pulled Nov 4, 2026177

License numbers are the ones the utilities recorded on the interconnection applications (177 of 182 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Santa Clara166
Contra Costa6
San Mateo5
Solano2
Merced1
Placer1
Riverside1

Top cities

CityInstalls
San Jose119
Sunnyvale10
Campbell6
Los Gatos5
Morgan Hill5
Cupertino4
Gilroy4
Los Altos3
Saratoga3
Byron2
Discovery Bay2
Los Altos Hills2
Milpitas2
Mountain View2
San Carlos2

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SOLAR EASE INC77
Solar Ease, Inc.74
SOLAR EASE, INC14
Solar Ease, Inc9
SOLAR EASE, INC.8

Common questions

Where does Solar Ease, Inc. install solar?

Its installs are spread across 7 counties. The most are in Santa Clara County (166 installs), followed by Contra Costa County (6).

How often does Solar Ease, Inc. install batteries with solar?

3.3% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 1).

How many Solar Ease, Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

2 of its 182 interconnected installs (1.1% of the 182 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.