SMART SOLAR DESIGN CONSTRUCTION LLC

How many solar installs has SMART SOLAR DESIGN CONSTRUCTION LLC done in California, and which license number is on its installs?

SMART SOLAR DESIGN CONSTRUCTION LLC has 148 residential solar installs interconnected in California, active in the records from 2017 through 2024 (Aug 7, 2017 to Sep 20, 2024), most of them in Riverside County (94), Orange County (26) and Los Angeles County (18). The license number recorded on most of its installs, 1016878, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
148
Last 24 months
1
Total capacity
1,503 kW DC
Median system size
9.6 kW DC
With battery storage
4.1% all time; 100.0% last 24 months
Third-party owned
0.0% of 148 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
2 installs, latest Sep 20, 2024
Ownership types recorded
none recorded
Median battery size
10.1 kWh (6 installs list a capacity)
First install
Aug 7, 2017
Latest install
Sep 20, 2024
Counties
6
Utilities
SCE 147, PGE 1
CSLB license
1016878

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2017 to 2026

YearInstalls interconnectedWith battery storage
201750
201880
201940
2020240
2021311
2022383
2023351
202431
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

2 of its 148 interconnected installs (1.4% of the 148 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 50.0% of those include battery storage. The latest Net Billing Tariff install was approved Sep 20, 2024.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.014698.6%5 (3.4%)
Net Billing Tariff21.4%1 (50.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on SMART SOLAR DESIGN CONSTRUCTION LLC’s installs. No residential system in the file lists a third-party owner name that matches SMART SOLAR DESIGN CONSTRUCTION LLC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 1 of SMART SOLAR DESIGN CONSTRUCTION LLC’s 1 installs name a module maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used modules recorded as Silfab.

In the last 24 months, 1 of SMART SOLAR DESIGN CONSTRUCTION LLC’s 1 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (1, 100.0%) used inverters recorded as Tesla.

In the last 24 months, 1 of SMART SOLAR DESIGN CONSTRUCTION LLC’s 1 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as Tesla.

5 of 6 battery-paired PG&E and SCE installs (83.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSilfab1not in top list
Inverter makerTesla17
Battery makerTesla11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 141 of 148 installs, inverters on 148. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names SMART SOLAR DESIGN CONSTRUCTION LLC as developer on 0 battery storage projects and as installer on 2 (0 name it as both), 2 projects in all with 51 kWh of storage. 2 have the status Paid, with $6,728 in current incentive allocations. Applications were received from Dec 6, 2021 to Dec 10, 2021.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid251$6,728

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage251$6,7282$6,728

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1016878Not found in the CSLB License Master file pulled Nov 4, 2026148

License numbers are the ones the utilities recorded on the interconnection applications (148 of 148 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list SMART SOLAR DESIGN CONSTRUCTION LLC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20182019202020212022202320242025Total
unincorporated San Diego County10168781521122252728112

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Riverside94
Orange26
Los Angeles18
San Bernardino8
Kern1
Ventura1

Top cities

CityInstalls
Temecula29
Murrieta19
Menifee16
Santa Ana6
Moreno Valley5
Calabasas4
Winchester4
Yorba Linda4
Agoura Hills3
Avalon3
Canyon Lake3
Costa Mesa3
Hemet3
Wildomar3
Corona2

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SMART SOLAR DESIGN CONSTRUCTION LLC148

Common questions

Where does SMART SOLAR DESIGN CONSTRUCTION LLC install solar?

Its installs are spread across 6 counties. The most are in Riverside County (94 installs), followed by Orange County (26).

How often does SMART SOLAR DESIGN CONSTRUCTION LLC install batteries with solar?

4.1% of its interconnected solar installs include battery storage across all years, and 100.0% in the last 24 months (1 of 1).

How many SMART SOLAR DESIGN CONSTRUCTION LLC installs are under NEM 3.0 (the Net Billing Tariff)?

2 of its 148 interconnected installs (1.4% of the 148 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 50.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.