Smart Solar Construction has 93 residential solar installs interconnected in California, active in the records from 2016 through 2026 (Feb 22, 2016 to Jul 22, 2026), most of them in Los Angeles County (48), Ventura County (42) and Riverside County (2). The license number recorded on most of its installs, 998255, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
93
Last 24 months
18
Total capacity
950.1 kW DC
Median system size
8.6 kW DC
With battery storage
41.9% all time; 83.3% last 24 months
Third-party owned
11.8% of 93 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
19 installs, latest Jul 22, 2026
Ownership types recorded
PPA 5, lease 2, other 4
Median battery size
13.5 kWh (39 installs list a capacity)
First install
Feb 22, 2016
Latest install
Jul 22, 2026
Counties
4
Utilities
SCE 93
CSLB license
998255

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2016 to 2026

YearInstalls interconnectedWith battery storage
201610
201710
201800
201900
202000
2021105
2022205
2023315
20241512
20251110
2026 (through Aug 31, 2026)42

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

19 of its 93 interconnected installs (20.4% of the 93 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 78.9% of those include battery storage. The latest Net Billing Tariff install was approved Jul 22, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.011.1%not counted
NEM 2.07378.5%24 (32.9%)
Net Billing Tariff1920.4%15 (78.9%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 11 of Smart Solar Construction’s installs the utility recorded a third-party ownership type: PPA 5, lease 2, prepaid lease 0, other 4. Across all installers, 2 residential systems list a third-party owner name that matches Smart Solar Construction exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
SunPower Capital, LLC3
Technology Credit Union3
LightReach2
SMART SOLAR CONSTRUCTION2
SunPower1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 18 of Smart Solar Construction’s 18 installs name a module maker in the “Generator Manufacturer” fields, and most of those (13, 72.2%) used modules recorded as SunPower.

In the last 24 months, 18 of Smart Solar Construction’s 18 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (16, 88.9%) used inverters recorded as Enphase.

In the last 24 months, 13 of Smart Solar Construction’s 18 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (8, 61.5%) used batteries recorded as Tesla.

30 of 39 battery-paired PG&E and SCE installs (76.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSunPower1378
Qcells22
Waaree26
Enphase1not in top list
Hyundai12
Inverter makerEnphase1652
SunPower210
Tesla14
Battery makerTesla88
Enphase33
SunPower219

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 90 of 93 installs, inverters on 93. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
998255Not found in the CSLB License Master file pulled Nov 4, 202691

License numbers are the ones the utilities recorded on the interconnection applications (93 of 93 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles48
Ventura42
Riverside2
Orange1

Top cities

CityInstalls
Simi Valley12
Camarillo8
Thousand Oaks8
Agoura Hills7
Topanga7
Malibu6
Westlake Village6
Oak Park5
Calabasas4
Newbury Park3
Ventura3
Manhattan Beach2
Moorpark2
Santa Clarita2
Valencia2

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SMART SOLAR CONSTRUCTION71
Smart Solar Construction22

Common questions

Where does Smart Solar Construction install solar?

Its installs are spread across 4 counties. The most are in Los Angeles County (48 installs), followed by Ventura County (42).

How often does Smart Solar Construction install batteries with solar?

41.9% of its interconnected solar installs include battery storage across all years, and 83.3% in the last 24 months (15 of 18).

How many Smart Solar Construction installs are under NEM 3.0 (the Net Billing Tariff)?

19 of its 93 interconnected installs (20.4% of the 93 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 78.9% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.