SKY LIMIT ENERGY

How many solar installs has SKY LIMIT ENERGY done in California, and which license number is on its installs?

SKY LIMIT ENERGY has 132 residential solar installs interconnected in California, active in the records from 2021 through 2026 (Feb 9, 2021 to Feb 17, 2026), most of them in Los Angeles County (80), Orange County (39) and Riverside County (6). The license number recorded on most of its installs, 1028421, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
132
Last 24 months
6
Total capacity
896.2 kW DC
Median system size
6.8 kW DC
With battery storage
6.8% all time; 16.7% last 24 months
Third-party owned
0.0% of 132 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
7 installs, latest Apr 2, 2024
Ownership types recorded
none recorded
Median battery size
10.5 kWh (9 installs list a capacity)
First install
Feb 9, 2021
Latest install
Feb 17, 2026
Counties
6
Utilities
SCE 132
CSLB license
1028421

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2021 to 2026

YearInstalls interconnectedWith battery storage
2021241
2022542
2023384
2024132
202520
2026 (through Aug 31, 2026)10

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

7 of its 132 interconnected installs (5.3% of the 132 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Apr 2, 2024.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.012594.7%9 (7.2%)
Net Billing Tariff75.3%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on SKY LIMIT ENERGY’s installs. No residential system in the file lists a third-party owner name that matches SKY LIMIT ENERGY exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 6 of SKY LIMIT ENERGY’s 6 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (2, 33.3%) used modules recorded as REC.

In the last 24 months, 6 of SKY LIMIT ENERGY’s 6 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (4, 66.7%) used inverters recorded as Enphase.

In the last 24 months, 1 of SKY LIMIT ENERGY’s 6 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as Enphase.

7 of 9 battery-paired PG&E and SCE installs (77.8%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC254
SEG Solar217
Hyundai119
Qcells132
Inverter makerEnphase462
SMA1not in top list
SolarEdge139
Battery makerEnphase17

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 126 of 132 installs, inverters on 132. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names SKY LIMIT ENERGY as developer on 0 battery storage projects and as installer on 2 (0 name it as both), 2 projects in all with 28 kWh of storage. 1 have the status Paid, with $1,705 in current incentive allocations. Applications were received from Jul 1, 2021 to Dec 30, 2021.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid19$1,705
RRF Rejected119$3,882

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage19$1,7051$1,705
Not stated119$3,8820$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1028421Not found in the CSLB License Master file pulled Nov 4, 2026131

License numbers are the ones the utilities recorded on the interconnection applications (132 of 132 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list SKY LIMIT ENERGY’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20232024Total
unincorporated San Diego County1028421213

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Los Angeles80
Orange39
Riverside6
San Bernardino3
Ventura3
Kern1

Top cities

CityInstalls
Garden Grove15
Valencia10
Rosemead9
Stevenson Ranch7
Canyon Country6
Altadena5
Fountain Valley4
Westminster4
Castaic3
Irvine3
Long Beach3
Monterey Park3
San Gabriel3
Santa Ana3
Arcadia2

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SKY LIMIT ENERGY132

Common questions

Where does SKY LIMIT ENERGY install solar?

Its installs are spread across 6 counties. The most are in Los Angeles County (80 installs), followed by Orange County (39).

How often does SKY LIMIT ENERGY install batteries with solar?

6.8% of its interconnected solar installs include battery storage across all years, and 16.7% in the last 24 months (1 of 6).

How many SKY LIMIT ENERGY installs are under NEM 3.0 (the Net Billing Tariff)?

7 of its 132 interconnected installs (5.3% of the 132 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.