RONCO SOLAR
How many solar installs has RONCO SOLAR done in California, and which license number is on its installs?
RONCO SOLAR has 100 residential solar installs interconnected in California, active in the records from 2009 through 2018 (Nov 18, 2009 to Aug 27, 2018), most of them in Los Angeles County (55), Orange County (20) and Ventura County (10). CSLB lists license 611593 (ECO ENERGY PRO'S INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Feb 28, 2027.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
The installs credited to RONCO SOLAR here carry more than one CSLB license number: 611593 on 82 (CSLB holder ECO ENERGY PRO'S INC, Winnetka) and 978569 on 18 (not found in the CSLB License Master file), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.
- Interconnected installs
- 100
- Last 24 months
- 0
- Total capacity
- 424.2 kW DC
- Median system size
- 3.7 kW DC
- With battery storage
- 0.0% all time; no installs in the last 24 months last 24 months
- Third-party owned
- 7.8% of 51 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 0 installs
- Ownership types recorded
- PPA 1, lease 2, other 1
- First install
- Nov 18, 2009
- Latest install
- Aug 27, 2018
- Counties
- 5
- Utilities
- SCE 100
- CSLB license
- 611593, 978569
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2009 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2009 | 1 | 0 |
| 2010 | 0 | 0 |
| 2011 | 4 | 0 |
| 2012 | 5 | 0 |
| 2013 | 52 | 0 |
| 2014 | 26 | 0 |
| 2015 | 11 | 0 |
| 2016 | 0 | 0 |
| 2017 | 0 | 0 |
| 2018 | 1 | 0 |
| 2019 | 0 | 0 |
| 2020 | 0 | 0 |
| 2021 | 0 | 0 |
| 2022 | 0 | 0 |
| 2023 | 0 | 0 |
| 2024 | 0 | 0 |
| 2025 | 0 | 0 |
| 2026 (through Aug 31, 2026) | 0 | 0 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
None of its 100 interconnected installs with a tariff recorded (100) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 99 | 99.0% | not counted |
| NEM 2.0 | 1 | 1.0% | 0 (0.0%) |
| Net Billing Tariff | 0 | 0.0% | 0 |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
On 4 of RONCO SOLAR’s installs the utility recorded a third-party ownership type: PPA 1, lease 2, prepaid lease 0, other 1. No residential system in the file lists a third-party owner name that matches RONCO SOLAR exactly.
| Third-party owner named on its installs | Installs |
|---|---|
| Edessa Capital LLC | 1 |
| Greenday Finance LLC | 1 |
| Kilowatt Systems, LLC | 1 |
| Kuhn, Daniel | 1 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
Across all years, 1 of RONCO SOLAR’s 100 installs name a module maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used modules recorded as SolarWorld.
Across all years, 100 of RONCO SOLAR’s 100 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (39, 39.0%) used inverters recorded as ABB.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | SolarWorld | 0 | 1 |
| Inverter maker | ABB | 0 | 39 |
| SMA | 0 | 31 | |
| Power-One | 0 | 19 | |
| Enphase | 0 | 7 | |
| SolarEdge | 0 | 4 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 1 of 100 installs, inverters on 100. See the methodology and the equipment index.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 611593 | ECO ENERGY PRO'S INC (Corporation) | CLEAR | C-10 Electrical Contractor; C-46 Solar Contractor | Feb 1, 1991 | Feb 28, 2027 | 82 |
| 978569 | Not found in the CSLB License Master file pulled Nov 4, 2026 | 18 | ||||
License numbers are the ones the utilities recorded on the interconnection applications (100 of 100 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 611593. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Counties
| County | Installs |
|---|---|
| Los Angeles | 55 |
| Orange | 20 |
| Ventura | 10 |
| San Bernardino | 9 |
| Riverside | 6 |
Top cities
| City | Installs |
|---|---|
| Orange | 5 |
| Norco | 4 |
| Topanga | 4 |
| Fullerton | 3 |
| Garden Grove | 3 |
| Rolling Hills | 3 |
| Thousand Oaks | 3 |
| Torrance | 3 |
| Beverly Hills | 2 |
| Calabasas | 2 |
| Camarillo | 2 |
| Canyon Country | 2 |
| Fountain Valley | 2 |
| Huntington Beach | 2 |
| Inglewood | 2 |
Names as recorded by the utilities
The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| RONCO SOLAR | 100 |
Common questions
Where does RONCO SOLAR install solar?
Its installs are spread across 5 counties. The most are in Los Angeles County (55 installs), followed by Orange County (20).
How often does RONCO SOLAR install batteries with solar?
0.0% of its interconnected solar installs include battery storage across all years.
How many RONCO SOLAR installs are under NEM 3.0 (the Net Billing Tariff)?
None of its 100 interconnected installs with a tariff recorded (100) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.