REVOLT ELECTRIC

How many solar installs has REVOLT ELECTRIC done in California, and which license number is on its installs?

REVOLT ELECTRIC has 442 residential solar installs interconnected in California, active in the records from 2016 through 2023 (Dec 16, 2016 to Feb 1, 2023), most of them in Los Angeles County (370), Kern County (59) and San Bernardino County (9). CSLB lists license 1019939 (SOLAR SHOPPERS CONSTRUCTION) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Oct 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
442
Last 24 months
0
Total capacity
3,288 kW DC
Median system size
7.1 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 442 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Dec 16, 2016
Latest install
Feb 1, 2023
Counties
5
Utilities
SCE 442
CSLB license
1019939

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2016 to 2026

YearInstalls interconnectedWith battery storage
201610
20171070
20181260
20191070
2020940
202160
202200
202310
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 442 interconnected installs with a tariff recorded (442) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.05111.5%not counted
NEM 2.039188.5%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on REVOLT ELECTRIC’s installs. No residential system in the file lists a third-party owner name that matches REVOLT ELECTRIC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 442 of REVOLT ELECTRIC’s 442 installs name a module maker in the “Generator Manufacturer” fields, and most of those (252, 57.0%) used modules recorded as Canadian Solar.

Across all years, 442 of REVOLT ELECTRIC’s 442 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (440, 99.5%) used inverters recorded as SolarEdge.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar0252
REC0116
SolarWorld032
LG023
Mission Solar019
Inverter makerSolarEdge0440
Delta Electronics01
SunPower01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 442 of 442 installs, inverters on 442. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names REVOLT ELECTRIC as developer on 156 battery storage projects and as installer on 155 (155 name it as both), 156 projects in all with 3,736 kWh of storage. 28 have the status Paid, with $730,880 in current incentive allocations. Applications were received from Jun 25, 2020 to Dec 15, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid28739$730,880
Reserved18290$475,047
Pending Reservation679$175,851
Cancelled1042,627$2,716,396

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency1263,340$3,292,20028$730,880
Residential Solar and Storage Equity - AB 209 Non-POU30396$805,9730$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1019939SOLAR SHOPPERS CONSTRUCTION (Corporation)CLEARC-10 Electrical ContractorOct 27, 2016Oct 31, 2028441

License numbers are the ones the utilities recorded on the interconnection applications (441 of 442 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1019939. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles370
Kern59
San Bernardino9
Riverside2
Ventura2

Top cities

CityInstalls
Lancaster195
Palmdale142
Rosamond42
Littlerock17
California City8
Tehachapi4
Victorville3
Apple Valley2
Lake Hughes2
Leona Valley2
Mojave2
Pearblossom2
Phelan2
Quartz Hill2
Simi Valley2

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
REVOLT ELECTRIC408
Revolt Electric23
revolt electric10
Revolt electric1

Common questions

Where does REVOLT ELECTRIC install solar?

Its installs are spread across 5 counties. The most are in Los Angeles County (370 installs), followed by Kern County (59).

How often does REVOLT ELECTRIC install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many REVOLT ELECTRIC installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 442 interconnected installs with a tariff recorded (442) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.