Renewable Electric Integration

How many solar installs has Renewable Electric Integration done in California, and which license number is on its installs?

Renewable Electric Integration has 149 residential solar installs interconnected in California, active in the records from 2013 through 2019 (Dec 18, 2013 to Jan 10, 2019), most of them in Fresno County (131), Tulare County (7) and Madera County (5). The license number recorded on most of its installs, 991263, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
149
Last 24 months
0
Total capacity
1,103.5 kW DC
Median system size
7.1 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 149 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Dec 18, 2013
Latest install
Jan 10, 2019
Counties
7
Utilities
PGE 142, SCE 7
CSLB license
991263

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2013 to 2026

YearInstalls interconnectedWith battery storage
201350
2014410
2015440
2016360
2017180
201840
201910
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 149 interconnected installs with a tariff recorded (149) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.012785.2%not counted
NEM 2.02214.8%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Renewable Electric Integration’s installs. No residential system in the file lists a third-party owner name that matches Renewable Electric Integration exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 147 of Renewable Electric Integration’s 149 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (60, 40.8%) used modules recorded as SolarWorld.

Across all years, 149 of Renewable Electric Integration’s 149 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (86, 57.7%) used inverters recorded as SolarEdge.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSolarWorld060
Canadian Solar033
Winaico023
LG06
Mitsubishi Electric06
Inverter makerSolarEdge086
Enphase054
SMA08
Enecsys01
Fronius01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 147 of 149 installs, inverters on 149. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
991263Not found in the CSLB License Master file pulled Nov 4, 2026124

License numbers are the ones the utilities recorded on the interconnection applications (125 of 149 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Fresno131
Tulare7
Madera5
Merced3
Kern1
Kings1
Solano1

Top cities

CityInstalls
Clovis59
Fresno55
Sanger6
Madera4
Tulare3
Visalia3
Friant2
Merced2
Parlier2
Atwater1
Auberry1
Bakersfield1
Caruthers1
Coalinga1
Coarsegold1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Renewable Electric Integration148
RENEWABLE ELECTRIC INTEGRATION1

Common questions

Where does Renewable Electric Integration install solar?

Its installs are spread across 7 counties. The most are in Fresno County (131 installs), followed by Tulare County (7).

How often does Renewable Electric Integration install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Renewable Electric Integration installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 149 interconnected installs with a tariff recorded (149) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.