QUALITY ELECTRICAL SOLUTION LLC

How many solar installs has QUALITY ELECTRICAL SOLUTION LLC done in California, and which license number is on its installs?

QUALITY ELECTRICAL SOLUTION LLC has 98 residential solar installs interconnected in California, active in the records from 2020 through 2026 (Jan 27, 2020 to Apr 15, 2026), most of them in San Joaquin County (39), Alameda County (23) and Contra Costa County (18). CSLB lists license 1083461 (QUALITY ELECTRICAL SOLUTION LLC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Nov 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

The installs credited to QUALITY ELECTRICAL SOLUTION LLC here carry more than one CSLB license number: 1083461 on 86 (CSLB holder QUALITY ELECTRICAL SOLUTION LLC, Livermore) and 1035478 on 12 (not found in the CSLB License Master file), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.

Interconnected installs
98
Last 24 months
4
Total capacity
714.8 kW DC
Median system size
6.7 kW DC
With battery storage
3.1% all time; 25.0% last 24 months
Third-party owned
0.0% of 98 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
3 installs, latest Jan 7, 2026
Ownership types recorded
none recorded
First install
Jan 27, 2020
Latest install
Apr 15, 2026
Counties
8
Utilities
PGE 98
CSLB license
1083461, 1035478

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2020 to 2026

YearInstalls interconnectedWith battery storage
202010
202180
2022350
2023471
202431
202520
2026 (through Aug 31, 2026)21

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

3 of its 98 interconnected installs (3.1% of the 98 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The latest Net Billing Tariff install was approved Jan 7, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.09596.9%0 (0.0%)
Net Billing Tariff33.1%3 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on QUALITY ELECTRICAL SOLUTION LLC’s installs. No residential system in the file lists a third-party owner name that matches QUALITY ELECTRICAL SOLUTION LLC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 4 of QUALITY ELECTRICAL SOLUTION LLC’s 4 installs name a module maker in the “Generator Manufacturer” fields, and most of those (3, 75.0%) used modules recorded as Hyundai.

In the last 24 months, 4 of QUALITY ELECTRICAL SOLUTION LLC’s 4 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (3, 75.0%) used inverters recorded as Enphase.

In the last 24 months, 1 of QUALITY ELECTRICAL SOLUTION LLC’s 4 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as Sigenergy.

3 of 3 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerHyundai33
Qcells144
Inverter makerEnphase390
Sigenergy11
Battery makerSigenergy11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 98 of 98 installs, inverters on 98. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1083461QUALITY ELECTRICAL SOLUTION LLC (Limited Liability)CLEARC-10 Electrical ContractorNov 5, 2021Nov 30, 202786
1035478Not found in the CSLB License Master file pulled Nov 4, 202612

License numbers are the ones the utilities recorded on the interconnection applications (98 of 98 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1083461. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list QUALITY ELECTRICAL SOLUTION LLC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2025Total
City and County of San Francisco108346111

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Joaquin39
Alameda23
Contra Costa18
San Mateo7
Santa Clara6
Merced3
Calaveras1
Stanislaus1

Top cities

CityInstalls
Tracy19
Manteca13
Livermore7
Brentwood6
Pleasanton5
Concord4
Milpitas4
Stockton4
Menlo Park3
Oakland3
San Leandro3
Alamo2
Castro Valley2
Gustine2
Pittsburg2

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
QUALITY ELECTRICAL SOLUTION LLC86
QUALITY ELECTRICAL SOLUTION12

Common questions

Where does QUALITY ELECTRICAL SOLUTION LLC install solar?

Its installs are spread across 8 counties. The most are in San Joaquin County (39 installs), followed by Alameda County (23).

How often does QUALITY ELECTRICAL SOLUTION LLC install batteries with solar?

3.1% of its interconnected solar installs include battery storage across all years, and 25.0% in the last 24 months (1 of 4).

How many QUALITY ELECTRICAL SOLUTION LLC installs are under NEM 3.0 (the Net Billing Tariff)?

3 of its 98 interconnected installs (3.1% of the 98 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.