PRO INSTALLATIONS CO

How many solar installs has PRO INSTALLATIONS CO done in California, and which license number is on its installs?

PRO INSTALLATIONS CO has 90 residential solar installs interconnected in California, active in the records from 2021 through 2026 (Mar 8, 2021 to Aug 11, 2026), most of them in Alameda County (32), Contra Costa County (28) and Santa Clara County (14). CSLB lists license 1058678 (PRO INSTALLATIONS CO) with status Contr Bond Susp in the License Master file pulled Nov 4, 2026, classifications B, expires Sep 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
90
Last 24 months
52
Total capacity
683 kW DC
Median system size
7.2 kW DC
With battery storage
61.1% all time; 96.2% last 24 months
Third-party owned
0.0% of 90 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
51 installs, latest Aug 11, 2026
Ownership types recorded
none recorded
Median battery size
13.5 kWh (45 installs list a capacity)
First install
Mar 8, 2021
Latest install
Aug 11, 2026
Counties
6
Utilities
PGE 90
CSLB license
1058678

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2021 to 2026

YearInstalls interconnectedWith battery storage
2021375
202210
202300
202400
20254947
2026 (through Aug 31, 2026)33

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

51 of its 90 interconnected installs (56.7% of the 90 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 96.1% of those include battery storage. The latest Net Billing Tariff install was approved Aug 11, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.011.1%not counted
NEM 2.03842.2%5 (13.2%)
Net Billing Tariff5156.7%49 (96.1%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on PRO INSTALLATIONS CO’s installs. No residential system in the file lists a third-party owner name that matches PRO INSTALLATIONS CO exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 52 of PRO INSTALLATIONS CO’s 52 installs name a module maker in the “Generator Manufacturer” fields, and most of those (33, 63.5%) used modules recorded as Hyundai.

In the last 24 months, 52 of PRO INSTALLATIONS CO’s 52 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (46, 88.5%) used inverters recorded as Tesla.

In the last 24 months, 43 of PRO INSTALLATIONS CO’s 52 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (39, 90.7%) used batteries recorded as Tesla.

47 of 55 battery-paired PG&E and SCE installs (85.5%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerHyundai3334
REC88
SunPower77
Your Energy Solutions2not in top list
LG130
Inverter makerTesla4648
Enphase1046
FranklinWH33
Battery makerTesla3941
FranklinWH33
Enphase11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 87 of 90 installs, inverters on 90. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1058678PRO INSTALLATIONS CO (Corporation)Contr Bond Susp, WC Susp PendingB General Building ContractorSep 30, 2019Sep 30, 202790

License numbers are the ones the utilities recorded on the interconnection applications (90 of 90 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1058678. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Alameda32
Contra Costa28
Santa Clara14
San Mateo11
San Francisco3
San Joaquin2

Top cities

CityInstalls
San Jose8
San Ramon8
Livermore7
Fremont6
Pleasanton6
Danville5
Dublin3
Oakland3
Orinda3
San Francisco3
Belmont2
Concord2
Hayward2
Lafayette2
Pleasant Hill2

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
PRO INSTALLATIONS CO90

Common questions

Where does PRO INSTALLATIONS CO install solar?

Its installs are spread across 6 counties. The most are in Alameda County (32 installs), followed by Contra Costa County (28).

How often does PRO INSTALLATIONS CO install batteries with solar?

61.1% of its interconnected solar installs include battery storage across all years, and 96.2% in the last 24 months (50 of 52).

How many PRO INSTALLATIONS CO installs are under NEM 3.0 (the Net Billing Tariff)?

51 of its 90 interconnected installs (56.7% of the 90 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 96.1% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.