PES ENERGY

How many solar installs has PES ENERGY done in California, and which license number is on its installs?

PES ENERGY has 62 residential solar installs interconnected in California, active in the records from 2024 through 2026 (Nov 15, 2024 to Aug 27, 2026), most of them in Ventura County (42), Los Angeles County (7) and Santa Barbara County (7). CSLB lists license 1122420 (PES ENERGY) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Jun 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
62
Last 24 months
62
Total capacity
441.4 kW DC
Median system size
6.4 kW DC
With battery storage
100.0% all time; 100.0% last 24 months
Third-party owned
0.0% of 62 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
53 installs, latest Aug 27, 2026
Ownership types recorded
none recorded
Median battery size
13.5 kWh (58 installs list a capacity)
First install
Nov 15, 2024
Latest install
Aug 27, 2026
Counties
6
Utilities
SCE 58, PGE 4
CSLB license
1122420

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2024 to 2026

YearInstalls interconnectedWith battery storage
202411
20253333
2026 (through Aug 31, 2026)2828

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

53 of its 62 interconnected installs (85.5% of the 62 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The latest Net Billing Tariff install was approved Aug 27, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.0914.5%9 (100.0%)
Net Billing Tariff5385.5%53 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on PES ENERGY’s installs. No residential system in the file lists a third-party owner name that matches PES ENERGY exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 62 of PES ENERGY’s 62 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (18, 29.0%) used modules recorded as Silfab.

In the last 24 months, 62 of PES ENERGY’s 62 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (43, 69.4%) used inverters recorded as Tesla.

In the last 24 months, 55 of PES ENERGY’s 62 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (48, 87.3%) used batteries recorded as Tesla.

55 of 62 battery-paired PG&E and SCE installs (88.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSilfab1818
JA Solar1010
REC99
United Renewable Energy88
Shenzhen Growatt New Energy Co., Ltd.66
Inverter makerTesla4343
Growatt77
Enphase33
Tigo Energy, Inc33
SolarEdge22
Battery makerTesla4848
FranklinWH55
Tigo Energy, Inc22

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 62 of 62 installs, inverters on 62. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names PES ENERGY as developer on 16 battery storage projects and as installer on 21 (16 name it as both), 21 projects in all with 408 kWh of storage. 10 have the status Paid, with $139,747 in current incentive allocations. Applications were received from Jul 24, 2023 to Dec 30, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid10184$139,747
Reserved453$7,914
Pending Reservation126$17,897
Cancelled6145$55,088

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency11237$189,6387$130,512
Small Residential Storage7119$17,8092$5,934
Large-Scale Storage353$13,2001$3,300

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1122420PES ENERGY (Corporation)CLEARB General Building ContractorJun 18, 2024Jun 30, 202862

License numbers are the ones the utilities recorded on the interconnection applications (62 of 62 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1122420. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Ventura42
Los Angeles7
Santa Barbara7
San Luis Obispo4
San Bernardino1
Tulare1

Top cities

CityInstalls
Camarillo17
Ventura8
Santa Barbara6
Newbury Park5
Malibu3
Oxnard3
Port Hueneme2
Santa Monica2
Simi Valley2
Thousand Oaks2
Apple Valley1
Arroyo Grande1
Cambria1
Carpinteria1
Covina1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
PES ENERGY62

Common questions

Where does PES ENERGY install solar?

Its installs are spread across 6 counties. The most are in Ventura County (42 installs), followed by Los Angeles County (7).

How often does PES ENERGY install batteries with solar?

100.0% of its interconnected solar installs include battery storage across all years, and 100.0% in the last 24 months (62 of 62).

How many PES ENERGY installs are under NEM 3.0 (the Net Billing Tariff)?

53 of its 62 interconnected installs (85.5% of the 62 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.