Pacific Electric Solar

How many solar installs has Pacific Electric Solar done in California, and which license number is on its installs?

Pacific Electric Solar has 208 residential solar installs interconnected in California, active in the records from 2006 through 2026 (Sep 18, 2006 to Jul 31, 2026), most of them in Ventura County (151), Los Angeles County (28) and Santa Barbara County (15). CSLB lists license 960241 (PACIFIC ELECTRIC SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications A, C-10, expires Apr 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
208
Last 24 months
4
Total capacity
1,591.1 kW DC
Median system size
6.8 kW DC
With battery storage
38.0% all time; 75.0% last 24 months
Third-party owned
2.9% of 205 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
3 installs, latest Sep 30, 2024
Ownership types recorded
PPA 1, lease 4, other 1
Median battery size
27 kWh (79 installs list a capacity)
First install
Sep 18, 2006
Latest install
Jul 31, 2026
Counties
7
Utilities
SCE 207, PGE 1
CSLB license
960241

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2006 to 2026

YearInstalls interconnectedWith battery storage
200620
200700
200800
200900
201000
201100
201200
201300
201400
2015110
2016150
2017230
2018110
2019125
202000
2021132
20225034
20235429
2024147
202511
2026 (through Aug 31, 2026)21

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

3 of its 208 interconnected installs (1.4% of the 208 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 66.7% of those include battery storage. The latest Net Billing Tariff install was approved Sep 30, 2024.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.04119.7%not counted
NEM 2.016478.8%77 (47.0%)
Net Billing Tariff31.4%2 (66.7%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 6 of Pacific Electric Solar’s installs the utility recorded a third-party ownership type: PPA 1, lease 4, prepaid lease 0, other 1. Across all installers, 1 residential systems list a third-party owner name that matches Pacific Electric Solar exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
SunPower4
Pacific Electric Solar1
Sunnova1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 4 of Pacific Electric Solar’s 4 installs name a module maker in the “Generator Manufacturer” fields, and most of those (4, 100.0%) used modules recorded as Qcells.

In the last 24 months, 4 of Pacific Electric Solar’s 4 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (2, 50.0%) used inverters recorded as SolarEdge.

In the last 24 months, 3 of Pacific Electric Solar’s 4 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (3, 100.0%) used batteries recorded as Tesla.

72 of 79 battery-paired PG&E and SCE installs (91.1%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells479
Inverter makerSolarEdge2111
Enphase149
Tesla18
Battery makerTesla372

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 198 of 208 installs, inverters on 208. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Pacific Electric Solar as developer on 0 battery storage projects and as installer on 92 (0 name it as both), 92 projects in all with 2,351 kWh of storage. 73 have the status Paid, with $974,861 in current incentive allocations. Applications were received from May 1, 2017 to Apr 2, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid731,869$974,861
Cancelled17430$279,390
RRF Rejected253$9,920

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage501,070$236,66043$205,319
Equity Resiliency35978$950,55226$714,682
Large-Scale Storage5250$67,0394$54,859
Not stated253$9,9200$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
960241PACIFIC ELECTRIC SOLAR (Corporation)CLEARA General Engineering Contractor; C-10 Electrical ContractorApr 22, 2011Apr 30, 2027192

License numbers are the ones the utilities recorded on the interconnection applications (192 of 208 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 960241. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Ventura151
Los Angeles28
Santa Barbara15
Tulare9
Orange3
Riverside1
San Bernardino1

Top cities

CityInstalls
Camarillo43
Ventura29
Oxnard17
Thousand Oaks15
Santa Barbara13
Newbury Park11
Moorpark9
Ojai8
Simi Valley8
Agoura Hills4
Exeter4
Malibu4
Visalia4
Santa Rosa Valley3
Westlake Village3

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Pacific Electric Solar118
PACIFIC ELECTRIC SOLAR87
PACIFIC ELECTRIC|SOLAR3

Common questions

Where does Pacific Electric Solar install solar?

Its installs are spread across 7 counties. The most are in Ventura County (151 installs), followed by Los Angeles County (28).

How often does Pacific Electric Solar install batteries with solar?

38.0% of its interconnected solar installs include battery storage across all years, and 75.0% in the last 24 months (3 of 4).

How many Pacific Electric Solar installs are under NEM 3.0 (the Net Billing Tariff)?

3 of its 208 interconnected installs (1.4% of the 208 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 66.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.