NT Electric

How many solar installs has NT Electric done in California, and which license number is on its installs?

NT Electric has 79 residential solar installs interconnected in California, active in the records from 2014 through 2021 (Jul 22, 2014 to Jun 2, 2021), most of them in Santa Clara County (66), Alameda County (6) and Contra Costa County (2). CSLB lists license 970562 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Mar 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

The installs credited to NT Electric here carry more than one CSLB license number: 970562 on 65 (CSLB holder Sole owner license (name not shown)) and 1235326 on 13 (not found in the CSLB License Master file), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.

Interconnected installs
79
Last 24 months
0
Total capacity
564.1 kW DC
Median system size
6.2 kW DC
With battery storage
1.3% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 79 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Jul 22, 2014
Latest install
Jun 2, 2021
Counties
7
Utilities
PGE 78, SCE 1
CSLB license
970562, 1235326

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
201430
2015150
2016150
201790
2018190
2019150
202021
202110
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 79 interconnected installs with a tariff recorded (79) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.03341.8%not counted
NEM 2.04658.2%1 (2.2%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on NT Electric’s installs. No residential system in the file lists a third-party owner name that matches NT Electric exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 79 of NT Electric’s 79 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (39, 49.4%) used modules recorded as Sunpreme.

Across all years, 79 of NT Electric’s 79 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (42, 53.2%) used inverters recorded as SolarEdge.

Across all years, 1 of NT Electric’s 79 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as LG.

1 of 1 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSunpreme039
Mission Solar037
Panasonic01
REC01
SolarWorld01
Inverter makerSolarEdge042
APsystems (Altenergy Power System)033
Enphase02
SMA02
Battery makerLG01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 79 of 79 installs, inverters on 79. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names NT Electric as developer on 0 battery storage projects and as installer on 1 (0 name it as both), 1 projects in all with 17 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Aug 4, 2020 to Aug 4, 2020.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Cancelled117$2,602

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage117$2,6020$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
970562Sole owner license (name not shown)CLEARC-10 Electrical ContractorMar 2, 2012Mar 31, 202865
1235326Not found in the CSLB License Master file pulled Nov 4, 202613

License numbers are the ones the utilities recorded on the interconnection applications (78 of 79 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 970562. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Santa Clara66
Alameda6
Contra Costa2
Santa Cruz2
Orange1
San Mateo1
Solano1

Top cities

CityInstalls
San Jose38
Cupertino5
Los Altos5
Campbell3
Los Gatos3
Dublin2
Fremont2
Gilroy2
Milpitas2
Morgan Hill2
Alviso1
Antioch1
Diablo1
Los Altos Hills1
Midway City1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
NT Electric51
NT ELECTRIC28

Common questions

Where does NT Electric install solar?

Its installs are spread across 7 counties. The most are in Santa Clara County (66 installs), followed by Alameda County (6).

How often does NT Electric install batteries with solar?

1.3% of its interconnected solar installs include battery storage across all years.

How many NT Electric installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 79 interconnected installs with a tariff recorded (79) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.