N T ELECTRIC

How many solar installs has N T ELECTRIC done in California, and which license number is on its installs?

N T ELECTRIC has 66 residential solar installs interconnected in California, active in the records from 2019 through 2026 (Nov 5, 2019 to Jul 1, 2026), most of them in Santa Clara County (47), Alameda County (6) and Fresno County (5). CSLB lists license 970562 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Mar 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
66
Last 24 months
3
Total capacity
525.7 kW DC
Median system size
7.5 kW DC
With battery storage
10.6% all time; 66.7% last 24 months
Third-party owned
0.0% of 66 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
3 installs, latest Jul 1, 2026
Ownership types recorded
none recorded
Median battery size
9.8 kWh (7 installs list a capacity)
First install
Nov 5, 2019
Latest install
Jul 1, 2026
Counties
7
Utilities
PGE 66
CSLB license
970562

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
201960
2020251
2021224
202250
202350
202400
202511
2026 (through Aug 31, 2026)21

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

3 of its 66 interconnected installs (4.5% of the 66 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 66.7% of those include battery storage. The latest Net Billing Tariff install was approved Jul 1, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.06395.5%5 (7.9%)
Net Billing Tariff34.5%2 (66.7%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on N T ELECTRIC’s installs. No residential system in the file lists a third-party owner name that matches N T ELECTRIC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 3 of N T ELECTRIC’s 3 installs name a module maker in the “Generator Manufacturer” fields, and most of those (2, 66.7%) used modules recorded as Hyundai.

In the last 24 months, 3 of N T ELECTRIC’s 3 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (2, 66.7%) used inverters recorded as Tesla.

In the last 24 months, 1 of N T ELECTRIC’s 3 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as Tesla.

6 of 7 battery-paired PG&E and SCE installs (85.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerHyundai2not in top list
Qcells114
Inverter makerTesla22
Enphase11
Battery makerTesla11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 66 of 66 installs, inverters on 65. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
970562Sole owner license (name not shown)CLEARC-10 Electrical ContractorMar 2, 2012Mar 31, 202866

License numbers are the ones the utilities recorded on the interconnection applications (66 of 66 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 970562. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Santa Clara47
Alameda6
Fresno5
San Mateo4
Contra Costa2
Monterey1
San Benito1

Top cities

CityInstalls
San Jose31
Clovis5
Los Altos3
Los Gatos3
Gilroy2
Los Altos Hills2
Milpitas2
Pleasanton2
Atherton1
Campbell1
Castro Valley1
Danville1
Emerald Hills1
Fremont1
Hayward1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
N T ELECTRIC65
N T Electric1

Common questions

Where does N T ELECTRIC install solar?

Its installs are spread across 7 counties. The most are in Santa Clara County (47 installs), followed by Alameda County (6).

How often does N T ELECTRIC install batteries with solar?

10.6% of its interconnected solar installs include battery storage across all years, and 66.7% in the last 24 months (2 of 3).

How many N T ELECTRIC installs are under NEM 3.0 (the Net Billing Tariff)?

3 of its 66 interconnected installs (4.5% of the 66 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 66.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.