NP Contracting Inc.

How many solar installs has NP Contracting Inc. done in California, and which license number is on its installs?

NP Contracting Inc. has 197 residential solar installs interconnected in California, active in the records from 2016 through 2017 (Jun 25, 2016 to Jul 11, 2017), most of them in Riverside County (128), Los Angeles County (59) and San Bernardino County (7). The license number recorded on most of its installs, 1013855, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
197
Last 24 months
0
Total capacity
1,042.9 kW DC
Median system size
4.9 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 197 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Jun 25, 2016
Latest install
Jul 11, 2017
Counties
5
Utilities
SCE 197
CSLB license
1013855

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2016 to 2026

YearInstalls interconnectedWith battery storage
20161500
2017470
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 197 interconnected installs with a tariff recorded (197) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.019599.0%not counted
NEM 2.021.0%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on NP Contracting Inc.’s installs. No residential system in the file lists a third-party owner name that matches NP Contracting Inc. exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 197 of NP Contracting Inc.’s 197 installs name a module maker in the “Generator Manufacturer” fields, and most of those (197, 100.0%) used modules recorded as Hyundai.

Across all years, 197 of NP Contracting Inc.’s 197 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (197, 100.0%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerHyundai0197
Inverter makerEnphase0197

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 197 of 197 installs, inverters on 197. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1013855Not found in the CSLB License Master file pulled Nov 4, 2026193

License numbers are the ones the utilities recorded on the interconnection applications (193 of 197 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list NP Contracting Inc.’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2018201920202021Total
unincorporated San Diego County101385558603323174

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Riverside128
Los Angeles59
San Bernardino7
Kern2
Orange1

Top cities

CityInstalls
Lancaster44
Corona36
Murrieta21
Lake Elsinore16
Menifee10
Moreno Valley9
Temecula9
Palmdale7
Winchester7
Perris6
Eastvale4
Ontario4
Riverside3
Valencia3
Grand Terrace2

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
NP Contracting Inc.102
NP Contracting Inc93
NP Contracting1
NP Contracting inc.1

Common questions

Where does NP Contracting Inc. install solar?

Its installs are spread across 5 counties. The most are in Riverside County (128 installs), followed by Los Angeles County (59).

How often does NP Contracting Inc. install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many NP Contracting Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 197 interconnected installs with a tariff recorded (197) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.