MR ELECTRIC

How many solar installs has MR ELECTRIC done in California, and which license number is on its installs?

MR ELECTRIC has 58 residential solar installs interconnected in California, active in the records from 2012 through 2021 (Aug 2, 2012 to Nov 25, 2021), most of them in Riverside County (28), San Bernardino County (23) and Orange County (5). The license number recorded on most of its installs, 947912, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
58
Last 24 months
0
Total capacity
507 kW DC
Median system size
8.3 kW DC
With battery storage
1.7% all time; no installs in the last 24 months last 24 months
Third-party owned
65.5% of 58 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 1, lease 14, other 23
Median battery size
9.8 kWh (1 installs list a capacity)
First install
Aug 2, 2012
Latest install
Nov 25, 2021
Counties
5
Utilities
SCE 57, PGE 1
CSLB license
947912

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2012 to 2026

YearInstalls interconnectedWith battery storage
201210
201300
201400
201500
201600
201700
201800
201900
202000
2021571
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 58 interconnected installs with a tariff recorded (58) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.011.7%not counted
NEM 2.05798.3%1 (1.8%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 38 of MR ELECTRIC’s installs the utility recorded a third-party ownership type: PPA 1, lease 14, prepaid lease 0, other 23. No residential system in the file lists a third-party owner name that matches MR ELECTRIC exactly.

Third-party owner named on its installsInstalls
POWUR25
HORIZON SOLAR POWER7
Sunrun2
T.A.K. ELECTRIC2
HPORIZON SOLAR POWER1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 58 of MR ELECTRIC’s 58 installs name a module maker in the “Generator Manufacturer” fields, and most of those (41, 70.7%) used modules recorded as Qcells.

Across all years, 58 of MR ELECTRIC’s 58 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (27, 46.6%) used inverters recorded as SolarEdge.

Across all years, 1 of MR ELECTRIC’s 58 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as LG.

1 of 1 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells041
Hyundai06
JinkoSolar05
LG03
Hanwa01
Inverter makerSolarEdge027
Enphase017
SunPower09
Tesla02
Delta Electronics01
Battery makerLG01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 58 of 58 installs, inverters on 58. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
947912Not found in the CSLB License Master file pulled Nov 4, 202657

License numbers are the ones the utilities recorded on the interconnection applications (57 of 58 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list MR ELECTRIC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020Total
unincorporated San Diego County947912136322

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Riverside28
San Bernardino23
Orange5
Los Angeles1
Tuolumne1

Top cities

CityInstalls
San Jacinto6
Riverside5
Fontana4
Hesperia3
Ontario3
Orange3
San Bernardino3
Alta Loma2
Beaumont2
Desert Hot Springs2
Temecula2
Twentynine Palms2
Victorville2
Winchester2
Barstow1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
MR ELECTRIC57
Mr Electric1

Common questions

Where does MR ELECTRIC install solar?

Its installs are spread across 5 counties. The most are in Riverside County (28 installs), followed by San Bernardino County (23).

How often does MR ELECTRIC install batteries with solar?

1.7% of its interconnected solar installs include battery storage across all years.

How many MR ELECTRIC installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 58 interconnected installs with a tariff recorded (58) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.