L.P. Daniel

How many solar installs has L.P. Daniel done in California, and which license number is on its installs?

L.P. Daniel has 169 residential solar installs interconnected in California, active in the records from 2015 through 2017 (Oct 14, 2015 to May 3, 2017), most of them in San Diego County (168) and Orange County (1). The license number recorded on most of its installs, 988770, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
169
Last 24 months
0
Total capacity
881.2 kW DC
Median system size
4.9 kW DC
With battery storage
not recorded (SDG&E files batteries as separate projects, not on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
91.7% of 169 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 154, other 1
First install
Oct 14, 2015
Latest install
May 3, 2017
Counties
2
Utilities
SDGE 169
CSLB license
988770, 764210

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2015 to 2026

YearInstalls interconnectedWith battery storage
2015130
20161370
2017190
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 169 interconnected installs with a tariff recorded (169) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.05029.6%not counted
NEM 2.011970.4%not recorded
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 155 of L.P. Daniel’s installs the utility recorded a third-party ownership type: PPA 154, lease 0, prepaid lease 0, other 1. No residential system in the file lists a third-party owner name that matches L.P. Daniel exactly.

Third-party owner named on its installsInstalls
Hibridhome137
Hibrid Home13
Hibrihome2
LP Daniel1
HibridHome.com1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 168 of L.P. Daniel’s 169 installs name a module maker in the “Generator Manufacturer” fields, and most of those (89, 53.0%) used modules recorded as SunEdison.

Across all years, 169 of L.P. Daniel’s 169 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (169, 100.0%) used inverters recorded as SolarEdge.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSunEdison089
Hyundai072
LG03
SolarWorld03
Qcells01
Inverter makerSolarEdge0169

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 168 of 169 installs, inverters on 169. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
988770Not found in the CSLB License Master file pulled Nov 4, 202692
764210Not found in the CSLB License Master file pulled Nov 4, 202638

License numbers are the ones the utilities recorded on the interconnection applications (132 of 169 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Other names reported under the same license

Counties

CountyInstalls
San Diego168
Orange1

Top cities

CityInstalls
Vista48
Oceanside33
San Diego26
Spring Valley21
Escondido18
San Marcos6
San Ysidro5
Santee4
Lemon Grove2
Poway2
Chula Vista1
El Cajon1
Lakeside1
San Clemente1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
L.P. Daniel169

Common questions

Where does L.P. Daniel install solar?

Its installs are spread across 2 counties. The most are in San Diego County (168 installs), followed by Orange County (1).

How often does L.P. Daniel install batteries with solar?

Battery storage is not recorded on its interconnected solar installs: SDG&E files a battery as its own project record, not on the solar record.

How many L.P. Daniel installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 169 interconnected installs with a tariff recorded (169) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.