GREEN SOLAR

How many solar installs has GREEN SOLAR done in California, and which license number is on its installs?

GREEN SOLAR has 253 residential solar installs interconnected in California, active in the records from 2014 through 2026 (Nov 14, 2014 to Aug 20, 2026), most of them in Santa Clara County (184), San Mateo County (42) and Alameda County (20). CSLB lists license 1018350 (GREEN SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-46, expires Sep 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
253
Last 24 months
49
Total capacity
1,619.8 kW DC
Median system size
6.1 kW DC
With battery storage
20.9% all time; 81.6% last 24 months
Third-party owned
0.0% of 248 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
52 installs, latest Mar 31, 2026
Ownership types recorded
none recorded
Median battery size
9.8 kWh (5 installs list a capacity)
First install
Nov 14, 2014
Latest install
Aug 20, 2026
Counties
7
Utilities
PGE 248, SCE 5
CSLB license
1018350

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
201410
201540
201600
201700
201800
201970
2020383
2021453
2022440
2023511
20242514
20253125
2026 (through Aug 31, 2026)77

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

52 of its 253 interconnected installs (20.6% of the 253 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 84.6% of those include battery storage. The latest Net Billing Tariff install was approved Mar 31, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.072.8%not counted
NEM 2.019476.7%9 (4.6%)
Net Billing Tariff5220.6%44 (84.6%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on GREEN SOLAR’s installs. No residential system in the file lists a third-party owner name that matches GREEN SOLAR exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 47 of GREEN SOLAR’s 49 installs name a module maker in the “Generator Manufacturer” fields, and most of those (27, 57.4%) used modules recorded as REC.

In the last 24 months, 49 of GREEN SOLAR’s 49 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (28, 57.1%) used inverters recorded as Enphase.

In the last 24 months, 38 of GREEN SOLAR’s 49 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (20, 52.6%) used batteries recorded as Tesla.

51 of 53 battery-paired PG&E and SCE installs (96.2%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC2796
Qcells1728
Hyundai3not in top list
Sharp1not in top list
Silfab111
Inverter makerEnphase28163
Tesla2222
FranklinWH1825
Fronius11
SunPower1not in top list
Battery makerTesla2020
FranklinWH1825

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 242 of 253 installs, inverters on 253. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1018350GREEN SOLAR (Corporation)CLEARC-46 Solar ContractorSep 16, 2016Sep 30, 2028247

License numbers are the ones the utilities recorded on the interconnection applications (247 of 253 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1018350. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Santa Clara184
San Mateo42
Alameda20
Los Angeles4
Contra Costa1
Kern1
Santa Cruz1

Top cities

CityInstalls
San Jose99
Campbell18
Los Gatos17
Sunnyvale14
Menlo Park10
Mountain View10
San Carlos10
Cupertino8
Redwood City8
Fremont7
San Mateo7
Saratoga7
Los Altos4
Pleasanton4
Livermore3

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
GREEN SOLAR253

Common questions

Where does GREEN SOLAR install solar?

Its installs are spread across 7 counties. The most are in Santa Clara County (184 installs), followed by San Mateo County (42).

How often does GREEN SOLAR install batteries with solar?

20.9% of its interconnected solar installs include battery storage across all years, and 81.6% in the last 24 months (40 of 49).

How many GREEN SOLAR installs are under NEM 3.0 (the Net Billing Tariff)?

52 of its 253 interconnected installs (20.6% of the 253 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 84.6% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.