GREEN REV ENERGY

How many solar installs has GREEN REV ENERGY done in California, and which license number is on its installs?

GREEN REV ENERGY has 101 residential solar installs interconnected in California, active in the records from 2016 through 2026 (Oct 31, 2016 to Aug 27, 2026), most of them in Ventura County (55), Santa Barbara County (38) and Los Angeles County (6). CSLB lists license 1012024 (GREEN REV ENERGY) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Mar 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
101
Last 24 months
34
Total capacity
797.2 kW DC
Median system size
6.8 kW DC
With battery storage
51.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 88.2% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
3.0% of 101 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
21 installs, latest Aug 19, 2026
Ownership types recorded
prepaid lease 3
Median battery size
13.5 kWh (50 installs list a capacity)
First install
Oct 31, 2016
Latest install
Aug 27, 2026
Counties
5
Utilities
SCE 99, PGE 1, SDGE 1
CSLB license
1012024

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2016 to 2026

YearInstalls interconnectedWith battery storage
201610
201730
201861
201950
202052
202187
2022115
2023224
202462
20251815
2026 (through Aug 31, 2026)1615

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

21 of its 101 interconnected installs (20.8% of the 101 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 90.5% of those include battery storage. The latest Net Billing Tariff install was approved Aug 19, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.033.0%not counted
NEM 2.07776.2%31 (40.8%)
Net Billing Tariff2120.8%19 (90.5%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 3 of GREEN REV ENERGY’s installs the utility recorded a third-party ownership type: PPA 0, lease 0, prepaid lease 3, other 0. Across all installers, 1 residential systems list a third-party owner name that matches GREEN REV ENERGY exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Green Rev Energy1
GreenStart Electrify1
SolSource DevCo, LLC1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 34 of GREEN REV ENERGY’s 34 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (16, 47.1%) used modules recorded as Qcells.

In the last 24 months, 34 of GREEN REV ENERGY’s 34 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (17, 50.0%) used inverters recorded as Tesla.

In the last 24 months, 30 of GREEN REV ENERGY’s 34 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (23, 76.7%) used batteries recorded as Tesla.

39 of 51 battery-paired PG&E and SCE installs (76.5%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells1660
Silfab413
REC3not in top list
JA Solar2not in top list
Solaria25
Inverter makerTesla1718
Enphase1337
SolarEdge329
Delta Electronics1not in top list
Power-One1not in top list
Battery makerTesla2326
FranklinWH55
Enphase27

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 101 of 101 installs, inverters on 101. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names GREEN REV ENERGY as developer on 5 battery storage projects and as installer on 8 (4 name it as both), 9 projects in all with 100 kWh of storage. 2 have the status Paid, with $5,931 in current incentive allocations. Applications were received from Feb 15, 2018 to Jan 26, 2026.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid224$5,931
Reserved223$14,656
Waitlist113$28,580
Cancelled440$18,853

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage547$8,5611$1,452
Equity Resiliency226$26,4000$0
Large-Scale Storage114$4,4781$4,478
Residential Solar and Storage Equity - AB 209 Non-POU113$28,5800$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1012024GREEN REV ENERGY (Corporation)CLEARC-10 Electrical ContractorMar 11, 2016Mar 31, 2028101

License numbers are the ones the utilities recorded on the interconnection applications (101 of 101 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1012024. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Ventura55
Santa Barbara38
Los Angeles6
San Bernardino1
San Diego1

Top cities

CityInstalls
Santa Barbara34
Ventura17
Newbury Park13
Thousand Oaks8
Ojai4
Oxnard4
Westlake Village3
Goleta2
Manhattan Beach2
Oak Park2
Santa Paula2
Somis2
Agoura Hills1
Apple Valley1
Carpinteria1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
GREEN REV ENERGY98
Green Rev Energy3

Common questions

Where does GREEN REV ENERGY install solar?

Its installs are spread across 5 counties. The most are in Ventura County (55 installs), followed by Santa Barbara County (38).

How often does GREEN REV ENERGY install batteries with solar?

51.0% of its interconnected solar installs include battery storage across all years, and 88.2% in the last 24 months (30 of 34). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many GREEN REV ENERGY installs are under NEM 3.0 (the Net Billing Tariff)?

21 of its 101 interconnected installs (20.8% of the 101 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 90.5% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.