GRC DESIGN AND BUILD

How many solar installs has GRC DESIGN AND BUILD done in California, and which license number is on its installs?

GRC DESIGN AND BUILD has 61 residential solar installs interconnected in California, active in the records from 2017 through 2025 (Apr 25, 2017 to Sep 30, 2025), most of them in El Dorado County (50), Placer County (7) and Solano County (2). CSLB lists license 959532 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Mar 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
61
Last 24 months
4
Total capacity
477 kW DC
Median system size
7.6 kW DC
With battery storage
8.2% all time; 100.0% last 24 months
Third-party owned
0.0% of 61 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
3 installs, latest Sep 30, 2025
Ownership types recorded
none recorded
Median battery size
28.6 kWh (3 installs list a capacity)
First install
Apr 25, 2017
Latest install
Sep 30, 2025
Counties
5
Utilities
PGE 61
CSLB license
959532

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2017 to 2026

YearInstalls interconnectedWith battery storage
201740
201880
2019110
202090
202150
202240
2023161
202400
202544
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

3 of its 61 interconnected installs (4.9% of the 61 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The latest Net Billing Tariff install was approved Sep 30, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.011.6%not counted
NEM 2.05793.4%1 (1.8%)
Net Billing Tariff34.9%3 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on GRC DESIGN AND BUILD’s installs. No residential system in the file lists a third-party owner name that matches GRC DESIGN AND BUILD exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 3 of GRC DESIGN AND BUILD’s 4 installs name a module maker in the “Generator Manufacturer” fields, and most of those (2, 66.7%) used modules recorded as EG4.

In the last 24 months, 4 of GRC DESIGN AND BUILD’s 4 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (3, 75.0%) used inverters recorded as APsystems (Altenergy Power System).

In the last 24 months, 1 of GRC DESIGN AND BUILD’s 4 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as FranklinWH.

2 of 5 battery-paired PG&E and SCE installs (40.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerEG42not in top list
Qcells226
Znshine1not in top list
Inverter makerAPsystems (Altenergy Power System)335
EG433
FranklinWH12
Fronius11
Battery makerFranklinWH12

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 57 of 61 installs, inverters on 61. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
959532Sole owner license (name not shown)CLEARB General Building ContractorApr 5, 2011Mar 31, 202861

License numbers are the ones the utilities recorded on the interconnection applications (61 of 61 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 959532. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
El Dorado50
Placer7
Solano2
San Mateo1
Santa Clara1

Top cities

CityInstalls
Placerville23
El Dorado Hills11
Cameron Park10
Loomis3
Auburn2
Shingle Springs2
Benicia1
Cool1
Daly City1
Elverta1
Fairfield1
Granite Bay1
Lotus1
Rescue1
San Jose1

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
GRC DESIGN AND BUILD41
GRC DESIGN & BUILD15
GRC Design & Build5

Common questions

Where does GRC DESIGN AND BUILD install solar?

Its installs are spread across 5 counties. The most are in El Dorado County (50 installs), followed by Placer County (7).

How often does GRC DESIGN AND BUILD install batteries with solar?

8.2% of its interconnected solar installs include battery storage across all years, and 100.0% in the last 24 months (4 of 4).

How many GRC DESIGN AND BUILD installs are under NEM 3.0 (the Net Billing Tariff)?

3 of its 61 interconnected installs (4.9% of the 61 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.