Funderburk Construction Inc

How many solar installs has Funderburk Construction Inc done in California, and which license number is on its installs?

Funderburk Construction Inc has 115 residential solar installs interconnected in California, active in the records from 2017 through 2026 (Jun 15, 2017 to Jul 9, 2026), most of them in San Diego County (107), Orange County (7) and Los Angeles County (1). CSLB lists license 463228 (FUNDERBURK CONSTRUCTION INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Mar 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
115
Last 24 months
17
Total capacity
690.9 kW DC
Median system size
4.7 kW DC
With battery storage
33.3% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 100.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.0% of 115 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
19 installs, latest Jul 9, 2026
Ownership types recorded
none recorded
Median battery size
13.5 kWh (1 installs list a capacity)
First install
Jun 15, 2017
Latest install
Jul 9, 2026
Counties
3
Utilities
SDGE 112, SCE 3
CSLB license
463228

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2017 to 2026

YearInstalls interconnectedWith battery storage
201730
201830
2019150
2020120
2021100
2022150
2023340
2024100
2025110
2026 (through Aug 31, 2026)21

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

19 of its 115 interconnected installs (16.5% of the 115 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Jul 9, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.09683.5%0 (0.0%)
Net Billing Tariff1916.5%1 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Funderburk Construction Inc’s installs. No residential system in the file lists a third-party owner name that matches Funderburk Construction Inc exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 17 of Funderburk Construction Inc’s 17 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (8, 47.1%) used modules recorded as LONGi.

In the last 24 months, 17 of Funderburk Construction Inc’s 17 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (17, 100.0%) used inverters recorded as APsystems (Altenergy Power System).

In the last 24 months, 1 of Funderburk Construction Inc’s 17 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as Tesla.

1 of 1 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLONGi88
Qcells756
JinkoSolar1not in top list
LG130
Inverter makerAPsystems (Altenergy Power System)17113
Battery makerTesla11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 114 of 115 installs, inverters on 115. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
463228FUNDERBURK CONSTRUCTION INC (Corporation)CLEARB General Building ContractorSep 24, 1984Mar 31, 2028115

License numbers are the ones the utilities recorded on the interconnection applications (115 of 115 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 463228. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Funderburk Construction Inc’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2018201920202021202220232025Total
unincorporated San Diego County4632281566613138

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Diego107
Orange7
Los Angeles1

Top cities

CityInstalls
Escondido29
San Diego18
Rancho Santa Fe13
Del Mar7
Encinitas7
Solana Beach7
Carlsbad5
Oceanside5
La Jolla3
Ramona3
San Marcos3
Valley Center3
Vista2
Cardiff1
El Cajon1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Funderburk Construction Inc112
FUNDERBURK CONSTRUCTION INC3

Common questions

Where does Funderburk Construction Inc install solar?

Its installs are spread across 3 counties. The most are in San Diego County (107 installs), followed by Orange County (7).

How often does Funderburk Construction Inc install batteries with solar?

33.3% of its interconnected solar installs include battery storage across all years, and 100.0% in the last 24 months (1 of 1). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Funderburk Construction Inc installs are under NEM 3.0 (the Net Billing Tariff)?

19 of its 115 interconnected installs (16.5% of the 115 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.