Energy Plus Solar has 61 residential solar installs interconnected in California, active in the records from 2017 through 2019 (Nov 15, 2017 to Aug 5, 2019), most of them in Los Angeles County (47), Ventura County (7) and Kern County (5). CSLB lists license 736839 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-20, C-38, C-46, expires Jun 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
61
Last 24 months
0
Total capacity
516.7 kW DC
Median system size
7.8 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
32.8% of 61 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
lease 20
First install
Nov 15, 2017
Latest install
Aug 5, 2019
Counties
5
Utilities
SCE 60, SDGE 1
CSLB license
736839

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2017 to 2026

YearInstalls interconnectedWith battery storage
201760
2018530
201920
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 61 interconnected installs with a tariff recorded (61) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.061100.0%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 20 of Energy Plus Solar’s installs the utility recorded a third-party ownership type: PPA 0, lease 20, prepaid lease 0, other 0. Across all installers, 58 residential systems list a third-party owner name that matches Energy Plus Solar exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Energy Plus Solar19
SunPower Capital LLC1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 61 of Energy Plus Solar’s 61 installs name a module maker in the “Generator Manufacturer” fields, and most of those (61, 100.0%) used modules recorded as SunPower.

Across all years, 61 of Energy Plus Solar’s 61 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (61, 100.0%) used inverters recorded as SunPower.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSunPower061
Inverter makerSunPower061

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 61 of 61 installs, inverters on 61. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Energy Plus Solar as developer on 3 battery storage projects and as installer on 4 (3 name it as both), 4 projects in all with 70 kWh of storage. 2 have the status Paid, with $8,691 in current incentive allocations. Applications were received from May 9, 2014 to Jun 9, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid214$8,691
Pending Reservation126$3,960
Cancelled130$7,497

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage233$5,9441$1,984
Large-Scale Storage130$7,4970$0
Not stated17$6,7071$6,707

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
736839Sole owner license (name not shown)CLEARC-10 Electrical Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-38; C-46 Solar ContractorJun 5, 1997Jun 30, 202759

License numbers are the ones the utilities recorded on the interconnection applications (61 of 61 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 736839. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Energy Plus Solar’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2018Total
unincorporated San Diego County73683911

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles47
Ventura7
Kern5
Orange1
San Bernardino1

Top cities

CityInstalls
Lancaster16
Palmdale13
Castaic6
Simi Valley6
Acton3
Rosamond3
California City2
Santa Clarita2
Westlake Village2
Borrego Springs1
Camarillo1
Carson1
Leona Valley1
Newhall1
Pinon Hills1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Energy Plus Solar56
ENERGY PLUS SOLAR5

Common questions

Where does Energy Plus Solar install solar?

Its installs are spread across 5 counties. The most are in Los Angeles County (47 installs), followed by Ventura County (7).

How often does Energy Plus Solar install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Energy Plus Solar installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 61 interconnected installs with a tariff recorded (61) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources