ECOLIVING INC

How many solar installs has ECOLIVING INC done in California, and which license number is on its installs?

ECOLIVING INC has 122 residential solar installs interconnected in California, active in the records from 2017 through 2026 (Dec 7, 2017 to Apr 13, 2026), most of them in Riverside County (91), San Bernardino County (25) and Orange County (5). CSLB lists license 918267 (ECOLIVING INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications A, C-10, expires Apr 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
122
Last 24 months
5
Total capacity
1,457.4 kW DC
Median system size
9.3 kW DC
With battery storage
7.5% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 100.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
1.6% of 122 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
10 installs, latest Apr 13, 2026
Ownership types recorded
PPA 2
Median battery size
10.5 kWh (9 installs list a capacity)
First install
Dec 7, 2017
Latest install
Apr 13, 2026
Counties
4
Utilities
SCE 120, SDGE 2
CSLB license
918267

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2017 to 2026

YearInstalls interconnectedWith battery storage
201720
201870
2019110
2020251
2021180
2022240
2023201
2024113
202533
2026 (through Aug 31, 2026)11

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

10 of its 122 interconnected installs (8.2% of the 122 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 77.8% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Apr 13, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.011291.8%2 (1.8%)
Net Billing Tariff108.2%7 (77.8%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 2 of ECOLIVING INC’s installs the utility recorded a third-party ownership type: PPA 2, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches ECOLIVING INC exactly.

Third-party owner named on its installsInstalls
Life Style Energy2

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 5 of ECOLIVING INC’s 5 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (2, 40.0%) used modules recorded as VSUN (Vietnam Sunergy).

In the last 24 months, 5 of ECOLIVING INC’s 5 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (5, 100.0%) used inverters recorded as Enphase.

In the last 24 months, 5 of ECOLIVING INC’s 5 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (5, 100.0%) used batteries recorded as Enphase.

8 of 9 battery-paired PG&E and SCE installs (88.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerVSUN (Vietnam Sunergy)2not in top list
JinkoSolar1not in top list
Qcells147
Znshine19
Inverter makerEnphase574
Battery makerEnphase58

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 120 of 122 installs, inverters on 122. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names ECOLIVING INC as developer on 0 battery storage projects and as installer on 2 (0 name it as both), 2 projects in all with 120 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Aug 8, 2024 to Sep 4, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Reserved2120$56,500

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency2120$56,5000$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
918267ECOLIVING INC (Corporation)CLEARA General Engineering Contractor; C-10 Electrical ContractorJun 26, 2008Apr 30, 2027122

License numbers are the ones the utilities recorded on the interconnection applications (122 of 122 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 918267. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Riverside91
San Bernardino25
Orange5
Los Angeles1

Top cities

CityInstalls
Palm Desert28
Rancho Mirage15
Indian Wells13
Palm Springs13
Yucca Valley8
Cathedral City7
Desert Center6
Morongo Valley5
Twentynine Palms5
Desert Hot Springs4
Mentone2
Santa Ana2
Beaumont1
Dana Point1
Fontana1

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ECOLIVING INC119
EcoLiving Inc dba Solar Ventures2
ECOLIVING INC dba Solar Ventures1

Common questions

Where does ECOLIVING INC install solar?

Its installs are spread across 4 counties. The most are in Riverside County (91 installs), followed by San Bernardino County (25).

How often does ECOLIVING INC install batteries with solar?

7.5% of its interconnected solar installs include battery storage across all years, and 100.0% in the last 24 months (5 of 5). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many ECOLIVING INC installs are under NEM 3.0 (the Net Billing Tariff)?

10 of its 122 interconnected installs (8.2% of the 122 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 77.8% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.