C K ELECTRIC

How many solar installs has C K ELECTRIC done in California, and which license number is on its installs?

C K ELECTRIC has 44 residential solar installs interconnected in California, active in the records from 2017 through 2024 (Aug 3, 2017 to Aug 26, 2024), most of them in Riverside County (25), Orange County (12) and Los Angeles County (7). CSLB lists license 354550 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Jan 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
44
Last 24 months
0
Total capacity
374.2 kW DC
Median system size
8.2 kW DC
With battery storage
2.3% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 44 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
1 installs, latest Aug 26, 2024
Ownership types recorded
none recorded
Median battery size
10.1 kWh (1 installs list a capacity)
First install
Aug 3, 2017
Latest install
Aug 26, 2024
Counties
3
Utilities
SCE 44
CSLB license
354550

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2017 to 2026

YearInstalls interconnectedWith battery storage
201720
201870
201990
202080
202180
202230
202350
202421
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

1 of its 44 interconnected installs (2.3% of the 44 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The latest Net Billing Tariff install was approved Aug 26, 2024.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.04397.7%0 (0.0%)
Net Billing Tariff12.3%1 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on C K ELECTRIC’s installs. No residential system in the file lists a third-party owner name that matches C K ELECTRIC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 43 of C K ELECTRIC’s 44 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (16, 37.2%) used modules recorded as Qcells.

Across all years, 44 of C K ELECTRIC’s 44 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (18, 40.9%) used inverters recorded as Enphase.

Across all years, 1 of C K ELECTRIC’s 44 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as Enphase.

1 of 1 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells016
LG015
Canadian Solar03
Hyundai03
JinkoSolar03
Inverter makerEnphase018
SolarEdge018
SMA06
SunPower02
Battery makerEnphase01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 43 of 44 installs, inverters on 44. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
354550Sole owner license (name not shown)CLEARC-10 Electrical ContractorMar 23, 1978Jan 31, 202744

License numbers are the ones the utilities recorded on the interconnection applications (44 of 44 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 354550. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list C K ELECTRIC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023202420252026Total
unincorporated San Diego County35455017812112019688109

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Riverside25
Orange12
Los Angeles7

Top cities

CityInstalls
Murrieta6
Temecula5
Corona4
Fountain Valley3
La Palma2
Perris2
Torrance2
Baldwin Park1
Buena Park1
Canyon Lake1
Downey1
Eastvale1
Garden Grove1
Huntington Beach1
Long Beach1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
C K ELECTRIC44

Common questions

Where does C K ELECTRIC install solar?

Its installs are spread across 3 counties. The most are in Riverside County (25 installs), followed by Orange County (12).

How often does C K ELECTRIC install batteries with solar?

2.3% of its interconnected solar installs include battery storage across all years.

How many C K ELECTRIC installs are under NEM 3.0 (the Net Billing Tariff)?

1 of its 44 interconnected installs (2.3% of the 44 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.