BTA Solar

How many solar installs has BTA Solar done in California, and which license number is on its installs?

BTA Solar has 144 residential solar installs interconnected in California, active in the records from 2007 through 2023 (Jul 9, 2007 to Jul 5, 2023), most of them in San Joaquin County (127), Alameda County (5) and Calaveras County (5). CSLB lists license 841362 (BTA SOLAR ELECTRICAL SERVICES INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Aug 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
144
Last 24 months
0
Total capacity
1,383.5 kW DC
Median system size
7.8 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 144 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
1 installs, latest Jul 5, 2023
Ownership types recorded
none recorded
First install
Jul 9, 2007
Latest install
Jul 5, 2023
Counties
9
Utilities
PGE 144
CSLB license
841362

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2007 to 2026

YearInstalls interconnectedWith battery storage
200730
200870
2009130
201070
2011140
201260
2013230
2014230
2015280
2016170
201720
201800
201900
202000
202100
202200
202310
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

1 of its 144 interconnected installs (0.7% of the 144 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Jul 5, 2023.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.014298.6%not counted
NEM 2.010.7%0 (0.0%)
Net Billing Tariff10.7%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on BTA Solar’s installs. No residential system in the file lists a third-party owner name that matches BTA Solar exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 141 of BTA Solar’s 144 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (43, 30.5%) used modules recorded as Silray.

Across all years, 144 of BTA Solar’s 144 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (129, 89.6%) used inverters recorded as SMA.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSilray043
Kyocera038
Advance Power029
Eoplly New Energy Technology09
Advance Solar Hydro Wind Power04
Inverter makerSMA0129
Enphase011
APsystems (Altenergy Power System)03
Fronius01
Kaco01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 141 of 144 installs, inverters on 144. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
841362BTA SOLAR ELECTRICAL SERVICES INC (Corporation)CLEARC-10 Electrical ContractorJun 22, 2004Aug 31, 202860

License numbers are the ones the utilities recorded on the interconnection applications (60 of 144 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 841362. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
San Joaquin127
Alameda5
Calaveras5
Santa Clara2
Contra Costa1
Fresno1
Placer1
Sacramento1
Stanislaus1

Top cities

CityInstalls
Stockton78
Linden18
Lodi18
Clements6
Acampo4
Fremont4
Valley Springs4
Escalon2
Brentwood1
Galt1
Granite Bay1
Lockeford1
Los Altos1
Oakdale1
Pleasanton1

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
BTA Solar118
BTA Solar, Inc.17
BTA Solar, Inc7
BTA solar1
BTA SOLAR1

Common questions

Where does BTA Solar install solar?

Its installs are spread across 9 counties. The most are in San Joaquin County (127 installs), followed by Alameda County (5).

How often does BTA Solar install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many BTA Solar installs are under NEM 3.0 (the Net Billing Tariff)?

1 of its 144 interconnected installs (0.7% of the 144 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.