BTA Solar & Electrical

How many solar installs has BTA Solar & Electrical done in California, and which license number is on its installs?

BTA Solar & Electrical has 94 residential solar installs interconnected in California, active in the records from 2018 through 2020 (Aug 30, 2018 to Apr 30, 2020), most of them in San Joaquin County (91), Calaveras County (1) and San Mateo County (1). CSLB lists license 841362 (BTA SOLAR ELECTRICAL SERVICES INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Aug 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
94
Last 24 months
0
Total capacity
456.1 kW DC
Median system size
1.2 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
51.1% of 94 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
lease 4, other 44
First install
Aug 30, 2018
Latest install
Apr 30, 2020
Counties
4
Utilities
PGE 94
CSLB license
841362

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2018 to 2026

YearInstalls interconnectedWith battery storage
2018220
2019690
202030
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 94 interconnected installs with a tariff recorded (94) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.094100.0%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 48 of BTA Solar & Electrical’s installs the utility recorded a third-party ownership type: PPA 0, lease 4, prepaid lease 0, other 44. No residential system in the file lists a third-party owner name that matches BTA Solar & Electrical exactly.

Third-party owner named on its installsInstalls
visionary48

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 94 of BTA Solar & Electrical’s 94 installs name a module maker in the “Generator Manufacturer” fields, and most of those (85, 90.4%) used modules recorded as Auxin Solar.

Across all years, 94 of BTA Solar & Electrical’s 94 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (63, 67.0%) used inverters recorded as APsystems (Altenergy Power System).

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerAuxin Solar085
Advance Power08
Trina Solar01
Inverter makerAPsystems (Altenergy Power System)063
SMA031

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 94 of 94 installs, inverters on 94. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
841362BTA SOLAR ELECTRICAL SERVICES INC (Corporation)CLEARC-10 Electrical ContractorJun 22, 2004Aug 31, 202890

License numbers are the ones the utilities recorded on the interconnection applications (94 of 94 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 841362. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
San Joaquin91
Calaveras1
San Mateo1
Solano1

Top cities

CityInstalls
Stockton78
Linden4
Ripon3
Acampo2
Lodi2
Escalon1
Fairfield1
Half Moon Bay1
Wallace1
Woodbridge1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
BTA Solar & Electrical94

Common questions

Where does BTA Solar & Electrical install solar?

Its installs are spread across 4 counties. The most are in San Joaquin County (91 installs), followed by Calaveras County (1).

How often does BTA Solar & Electrical install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many BTA Solar & Electrical installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 94 interconnected installs with a tariff recorded (94) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.