ARTGREEN CONSTRUCTION

How many solar installs has ARTGREEN CONSTRUCTION done in California, and which license number is on its installs?

ARTGREEN CONSTRUCTION has 230 residential solar installs interconnected in California, active in the records from 2018 through 2025 (Mar 9, 2018 to Jan 14, 2025), most of them in Los Angeles County (169), Ventura County (42) and Orange County (9). The license number recorded on most of its installs, 897539, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
230
Last 24 months
6
Total capacity
2,062.7 kW DC
Median system size
8.7 kW DC
With battery storage
13.0% all time; 100.0% last 24 months
Third-party owned
0.0% of 230 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
28 installs, latest Jan 14, 2025
Ownership types recorded
none recorded
Median battery size
10.5 kWh (30 installs list a capacity)
First install
Mar 9, 2018
Latest install
Jan 14, 2025
Counties
5
Utilities
SCE 230
CSLB license
897539

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2018 to 2026

YearInstalls interconnectedWith battery storage
2018210
2019210
202000
2021180
2022610
2023813
20242726
202511
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

28 of its 230 interconnected installs (12.2% of the 230 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The latest Net Billing Tariff install was approved Jan 14, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.020287.8%2 (1.0%)
Net Billing Tariff2812.2%28 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on ARTGREEN CONSTRUCTION’s installs. No residential system in the file lists a third-party owner name that matches ARTGREEN CONSTRUCTION exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 6 of ARTGREEN CONSTRUCTION’s 6 installs name a module maker in the “Generator Manufacturer” fields, and most of those (6, 100.0%) used modules recorded as REC.

In the last 24 months, 6 of ARTGREEN CONSTRUCTION’s 6 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (6, 100.0%) used inverters recorded as Enphase.

In the last 24 months, 6 of ARTGREEN CONSTRUCTION’s 6 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (6, 100.0%) used batteries recorded as Enphase.

30 of 30 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC6155
Inverter makerEnphase694
Battery makerEnphase630

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 218 of 230 installs, inverters on 230. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names ARTGREEN CONSTRUCTION as developer on 10 battery storage projects and as installer on 9 (9 name it as both), 10 projects in all with 97 kWh of storage. 7 have the status Paid, with $9,372 in current incentive allocations. Applications were received from Apr 26, 2023 to Aug 9, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid768$9,372
Reserved110$1,303
Cancelled219$2,759

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage1097$13,4357$9,372

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
897539Not found in the CSLB License Master file pulled Nov 4, 2026229

License numbers are the ones the utilities recorded on the interconnection applications (230 of 230 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Los Angeles169
Ventura42
Orange9
San Bernardino8
Riverside2

Top cities

CityInstalls
Torrance16
Thousand Oaks15
Simi Valley13
Arcadia10
Moorpark10
Rancho Palos Verdes9
Santa Clarita6
Valencia6
Agoura Hills5
El Segundo5
Hacienda Heights5
Long Beach5
Monrovia5
Newbury Park5
Rancho Cucamonga5

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ARTGREEN CONSTRUCTION220
ArtGreen Construction9
ARTGREEN CONSTRUCTION INC1

Common questions

Where does ARTGREEN CONSTRUCTION install solar?

Its installs are spread across 5 counties. The most are in Los Angeles County (169 installs), followed by Ventura County (42).

How often does ARTGREEN CONSTRUCTION install batteries with solar?

13.0% of its interconnected solar installs include battery storage across all years, and 100.0% in the last 24 months (6 of 6).

How many ARTGREEN CONSTRUCTION installs are under NEM 3.0 (the Net Billing Tariff)?

28 of its 230 interconnected installs (12.2% of the 230 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.