AMERIGREEN BUILDERS INC

How many solar installs has AMERIGREEN BUILDERS INC done in California, and which license number is on its installs?

AMERIGREEN BUILDERS INC has 299 residential solar installs interconnected in California, active in the records from 2017 through 2026 (May 31, 2017 to Aug 25, 2026), most of them in Los Angeles County (202), Orange County (46) and Ventura County (27). CSLB lists license 1023006 (AMERIGREEN BUILDERS INC) with status Work Comp Susp in the License Master file pulled Nov 4, 2026, classifications B, expires Jan 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
299
Last 24 months
21
Total capacity
2,555.4 kW DC
Median system size
7.7 kW DC
With battery storage
8.7% all time; 52.4% last 24 months
Third-party owned
0.0% of 299 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
17 installs, latest Aug 25, 2026
Ownership types recorded
none recorded
Median battery size
10.1 kWh (26 installs list a capacity)
First install
May 31, 2017
Latest install
Aug 25, 2026
Counties
6
Utilities
SCE 298, PGE 1
CSLB license
1023006

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2017 to 2026

YearInstalls interconnectedWith battery storage
201760
2018220
2019381
2020211
2021382
2022568
2023803
2024200
202563
2026 (through Aug 31, 2026)128

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

17 of its 299 interconnected installs (5.7% of the 299 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 58.8% of those include battery storage. The latest Net Billing Tariff install was approved Aug 25, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.031.0%not counted
NEM 2.027993.3%16 (5.7%)
Net Billing Tariff175.7%10 (58.8%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on AMERIGREEN BUILDERS INC’s installs. No residential system in the file lists a third-party owner name that matches AMERIGREEN BUILDERS INC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 21 of AMERIGREEN BUILDERS INC’s 21 installs name a module maker in the “Generator Manufacturer” fields, and most of those (11, 52.4%) used modules recorded as Panasonic.

In the last 24 months, 21 of AMERIGREEN BUILDERS INC’s 21 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (19, 90.5%) used inverters recorded as Enphase.

In the last 24 months, 11 of AMERIGREEN BUILDERS INC’s 21 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (10, 90.9%) used batteries recorded as Enphase.

22 of 26 battery-paired PG&E and SCE installs (84.6%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerPanasonic11152
Hyundai844
JA Solar1not in top list
Solaria1not in top list
Inverter makerEnphase1999
SolarEdge1155
Tesla17
Battery makerEnphase1018
Tesla13

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 290 of 299 installs, inverters on 299. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names AMERIGREEN BUILDERS INC as developer on 25 battery storage projects and as installer on 6 (6 name it as both), 25 projects in all with 342 kWh of storage. 16 have the status Paid, with $89,710 in current incentive allocations. Applications were received from Oct 10, 2019 to Jul 23, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid16212$89,710
Reserved223$15,593
Cancelled7107$34,821

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage18231$43,03012$28,239
Equity Resiliency695$94,7844$61,471
Large-Scale Storage116$2,3100$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1023006AMERIGREEN BUILDERS INC (Corporation)Work Comp SuspB General Building ContractorJan 26, 2017Jan 31, 2027299

License numbers are the ones the utilities recorded on the interconnection applications (299 of 299 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1023006. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Los Angeles202
Orange46
Ventura27
San Bernardino17
Riverside5
Kern2

Top cities

CityInstalls
Long Beach17
Culver City12
Agoura Hills8
Ontario8
Thousand Oaks8
Calabasas7
Rancho Palos Verdes7
San Gabriel7
Santa Clarita7
Simi Valley7
Alhambra6
Huntington Beach6
Pasadena6
Santa Monica6
Westlake Village6

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
AMERIGREEN BUILDERS INC295
AmeriGreen Builders Inc2
AmeriGreen Builders Inc.2

Common questions

Where does AMERIGREEN BUILDERS INC install solar?

Its installs are spread across 6 counties. The most are in Los Angeles County (202 installs), followed by Orange County (46).

How often does AMERIGREEN BUILDERS INC install batteries with solar?

8.7% of its interconnected solar installs include battery storage across all years, and 52.4% in the last 24 months (11 of 21).

How many AMERIGREEN BUILDERS INC installs are under NEM 3.0 (the Net Billing Tariff)?

17 of its 299 interconnected installs (5.7% of the 299 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 58.8% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.