How many solar installs has Alternative Energy Solutions done in California, and which license number is on its installs?

Alternative Energy Solutions has 40 residential solar installs interconnected in California, active in the records from 2005 through 2026 (Jan 27, 2005 to Jul 10, 2026), most of them in Ventura County (32), Butte County (2) and Los Angeles County (2). CSLB lists license 1123060 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Jun 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
40
Last 24 months
34
Total capacity
327.6 kW DC
Median system size
7 kW DC
With battery storage
82.5% all time; 94.1% last 24 months
Third-party owned
0.0% of 40 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
22 installs, latest Jul 10, 2026
Ownership types recorded
none recorded
Median battery size
13.5 kWh (32 installs list a capacity)
First install
Jan 27, 2005
Latest install
Jul 10, 2026
Counties
7
Utilities
SCE 34, PGE 6
CSLB license
1123060

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2005 to 2026

YearInstalls interconnectedWith battery storage
200510
200600
200700
200810
200900
201020
201100
201210
201300
201400
201500
201600
201700
201800
201900
202000
202111
202200
202300
202410
20252221
2026 (through Aug 31, 2026)1111

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

22 of its 40 interconnected installs (55.0% of the 40 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 95.5% of those include battery storage. The latest Net Billing Tariff install was approved Jul 10, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0512.5%not counted
NEM 2.01332.5%12 (92.3%)
Net Billing Tariff2255.0%21 (95.5%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Alternative Energy Solutions’s installs. No residential system in the file lists a third-party owner name that matches Alternative Energy Solutions exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 34 of Alternative Energy Solutions’ 34 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (13, 38.2%) used modules recorded as Silfab.

In the last 24 months, 34 of Alternative Energy Solutions’ 34 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (20, 58.8%) used inverters recorded as Enphase.

In the last 24 months, 32 of Alternative Energy Solutions’ 34 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (22, 68.8%) used batteries recorded as Tesla.

33 of 33 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSilfab1313
Qcells77
REC55
Solaria22
JA Solar1not in top list
Inverter makerEnphase2022
Tesla1011
SolarEdge22
Power-One1not in top list
SMA12
Battery makerTesla2223
Enphase1010

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 40 of 40 installs, inverters on 40. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1123060Sole owner license (name not shown)CLEARC-10 Electrical ContractorJun 28, 2024Jun 30, 202834

License numbers are the ones the utilities recorded on the interconnection applications (34 of 40 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1123060. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Ventura32
Butte2
Los Angeles2
Glenn1
San Joaquin1
Shasta1
Sonoma1

Top cities

CityInstalls
Ventura8
Camarillo6
Newbury Park6
Thousand Oaks5
Ojai2
Santa Rosa Valley2
Westlake Village2
Chico1
Cottonwood1
Oak Park1
Paradise1
Petaluma1
Ripon1
Santa Paula1
Simi Valley1

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ALTERNATIVE ENERGY SOLUTIONS34
Alternative Energy Solutions5
alternative Energy Solutions1

Common questions

Where does Alternative Energy Solutions install solar?

Its installs are spread across 7 counties. The most are in Ventura County (32 installs), followed by Butte County (2).

How often does Alternative Energy Solutions install batteries with solar?

82.5% of its interconnected solar installs include battery storage across all years, and 94.1% in the last 24 months (32 of 34).

How many Alternative Energy Solutions installs are under NEM 3.0 (the Net Billing Tariff)?

22 of its 40 interconnected installs (55.0% of the 40 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 95.5% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.