Home solar in ZIP code 95665, California

Service city recorded on most installs: Pine Grove. County: Amador County.

How many homes in ZIP code 95665 have solar?

PG&E, SCE and SDG&E interconnected 440 residential solar systems in ZIP code 95665 through Aug 31, 2026, 63 of them in the last 24 months (Sep 2024 through Aug 2026). The utilities recorded Pine Grove, Amador County, as the service city on 439 of them. V3 Electric has the most installs recorded in this ZIP, 102.

Counts of interconnected systems from utility records, not a rating of any installer.

Data: California DG Stats interconnection records (Interconnected_Project_Sites_2026-08-31.zip), which run through Aug 31, 2026. ZIP codes are the service ZIP the utility recorded on each project.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

At a glance

Residential solar installs
440
Last 24 months
63 (Sep 2024 through Aug 2026)
Capacity
3,448.2 kW DC
Median system size
7.4 kW DC
Net Billing Tariff (NEM 3.0)
93 installs, 21.1% of those with a tariff recorded
Utility
PGE 440
First install in data
May 30, 2002
Latest install in data
Aug 24, 2026

Installs by year

YearInstalls interconnectedWith battery storage
200220
200310
200410
200500
200620
200720
200810
200960
201020
201140
201210
201350
201430
2015100
2016150
2017220
2018340
2019282
2020245
2021366
20224810
20239720
20244833
20252725
2026 (through Aug 31, 2026)2117

Battery storage

26.8% of the residential solar installs here include battery storage across all years (118 of 440). In the last 24 months the share was 79.4% (50 of 63).

Net metering tariff

Of the 440 installs with a net metering tariff recorded: NEM 1.0 56 (12.7%), NEM 2.0 291 (66.1%), the Net Billing Tariff (often called NEM 3.0) 93 (21.1%). The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Lease, PPA or owned

36.1% of the 440 installs with ownership recorded are third-party owned (a lease or power purchase agreement); the other 281 are recorded as not third-party owned. Ownership types recorded: PPA 143, lease 13, prepaid lease 1, other 2.

Installers by installs in 95665

Installers with a page in this index, most installs in this ZIP first. 102 such installers have at least one install here. 17 more installs were by 12 installer names without a page in this index. 11 were self-installed or had no installer recorded. Counts of connected systems, not a rating.

InstallerInstalls in 95665Last 24 months
V3 Electric10215
Sunrun5217
Gold Rush Energy Solutions180
SunPower180
SunnyCal Solar Inc140
Tesla Energy Operations (formerly SolarCity)140
FREEDOM FOREVER LLC81
Bright Planet Solar70
I Love My Solar71
SOLAR SAVINGS DIRECT INC73

City and county recorded for 95665

The Service City and Service County the utilities entered on this ZIP’s installs, as recorded. No outside ZIP directory is used.

Recorded asInstalls
City: Pine Grove439
County: Amador County440

1 other city value on 1 install, each under 1% of this ZIP’s installs, are not listed.

Common questions

How common are home batteries with solar in 95665?

26.8% of the residential solar installs here include battery storage across all years (118 of 440). In the last 24 months the share was 79.4% (50 of 63).

How many solar installs in 95665 are under NEM 3.0?

93 of the 440 installs here with a tariff recorded (21.1%) were interconnected under the Net Billing Tariff, often called NEM 3.0, which applies to interconnection applications submitted on or after April 15, 2023.

Which solar installers have the most installs in 95665?

Among installers with a page in this index, by installs interconnected here through Aug 31, 2026: V3 Electric (102), Sunrun (52), Gold Rush Energy Solutions (18). These are counts of connected systems, not a rating of price, workmanship or service.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.