Home solar in ZIP code 95251, California

Service city recorded on most installs: Vallecito. County: Calaveras County.

How many homes in ZIP code 95251 have solar?

PG&E, SCE and SDG&E interconnected 81 residential solar systems in ZIP code 95251 through Aug 31, 2026, 13 of them in the last 24 months (Sep 2024 through Aug 2026). The utilities recorded Vallecito, Calaveras County, as the service city on 80 of them. SIG SOLAR, S.I.G. has the most installs recorded in this ZIP, 9.

Counts of interconnected systems from utility records, not a rating of any installer.

Data: California DG Stats interconnection records (Interconnected_Project_Sites_2026-08-31.zip), which run through Aug 31, 2026. ZIP codes are the service ZIP the utility recorded on each project.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

At a glance

Residential solar installs
81
Last 24 months
13 (Sep 2024 through Aug 2026)
Capacity
660.9 kW DC
Median system size
6.9 kW DC
Net Billing Tariff (NEM 3.0)
20 installs, 24.7% of those with a tariff recorded
Utility
PGE 81
First install in data
Feb 14, 2005
Latest install in data
Jul 1, 2026

Installs by year

YearInstalls interconnectedWith battery storage
200510
200600
200700
200810
200920
201010
201120
201200
201310
201410
201550
201610
201700
201850
201960
202070
202173
202251
2023151
20241210
202544
2026 (through Aug 31, 2026)53

Battery storage

27.2% of the residential solar installs here include battery storage across all years (22 of 81). In the last 24 months the share was 76.9% (10 of 13).

Net metering tariff

Of the 81 installs with a net metering tariff recorded: NEM 1.0 15 (18.5%), NEM 2.0 46 (56.8%), the Net Billing Tariff (often called NEM 3.0) 20 (24.7%). The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Lease, PPA or owned

24.7% of the 81 installs with ownership recorded are third-party owned (a lease or power purchase agreement); the other 61 are recorded as not third-party owned. Ownership types recorded: PPA 17, lease 3.

Installers by installs in 95251

Installers with a page in this index, most installs in this ZIP first. 32 such installers have at least one install here. 4 more installs were by 4 installer names without a page in this index. 3 were self-installed or had no installer recorded. Counts of connected systems, not a rating.

InstallerInstalls in 95251Last 24 months
SIG SOLAR, S.I.G.92
V3 Electric92
Gold Electric, Inc.81
Sunrun62
Hooked On Solar40
SOLARWORX INC40
SOLAR INSTALLATION GROUP, INC.30
Alternative Power Solutions, Inc.20
Freedom Energy Corp20
FREEDOM FOREVER LLC20

City and county recorded for 95251

The Service City and Service County the utilities entered on this ZIP’s installs, as recorded. No outside ZIP directory is used.

Recorded asInstalls
City: Vallecito80
City: Douglas Flat1
County: Calaveras County81

Common questions

How common are home batteries with solar in 95251?

27.2% of the residential solar installs here include battery storage across all years (22 of 81). In the last 24 months the share was 76.9% (10 of 13).

How many solar installs in 95251 are under NEM 3.0?

20 of the 81 installs here with a tariff recorded (24.7%) were interconnected under the Net Billing Tariff, often called NEM 3.0, which applies to interconnection applications submitted on or after April 15, 2023.

Which solar installers have the most installs in 95251?

Among installers with a page in this index, by installs interconnected here through Aug 31, 2026: SIG SOLAR, S.I.G. (9), V3 Electric (9), Gold Electric, Inc. (8). These are counts of connected systems, not a rating of price, workmanship or service.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.