Freedom Energy Corp has 60 residential solar installs interconnected in California, active in the records from 2015 through 2024 (Apr 8, 2015 to Jul 22, 2024), most of them in Calaveras County (41), Tuolumne County (9) and San Joaquin County (5). CSLB lists license 947048 (FREEDOM ENERGY CORP) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires May 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
60
Last 24 months
0
Total capacity
434.7 kW DC
Median system size
6.1 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 60 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Apr 8, 2015
Latest install
Jul 22, 2024
Counties
5
Utilities
PGE 60
CSLB license
947048

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2015 to 2026

YearInstalls interconnectedWith battery storage
201550
201670
201740
201870
2019110
2020140
202140
202230
202330
202420
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 60 interconnected installs with a tariff recorded (60) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.01220.0%not counted
NEM 2.04880.0%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Freedom Energy Corp’s installs. No residential system in the file lists a third-party owner name that matches Freedom Energy Corp exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 58 of Freedom Energy Corp’s 60 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (24, 41.4%) used modules recorded as Canadian Solar.

Across all years, 60 of Freedom Energy Corp’s 60 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (42, 70.0%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar024
Trina Solar011
Mission Solar08
Qcells06
GCL System Integration Technology Co., Ltd.03
Inverter makerEnphase042
SolarEdge09
Fronius07
SMA03
OutBack Power01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 58 of 60 installs, inverters on 60. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
947048FREEDOM ENERGY CORP (Corporation)CLEARC-10 Electrical ContractorMay 10, 2010May 31, 202759

License numbers are the ones the utilities recorded on the interconnection applications (59 of 60 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 947048. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Calaveras41
Tuolumne9
San Joaquin5
Amador4
San Mateo1

Top cities

CityInstalls
San Andreas11
Sonora6
Murphys5
Valley Springs5
Angels Camp4
Burson4
Lodi3
Mokelumne Hill3
Acampo2
Columbia2
Mountain Ranch2
Pioneer2
Rail Road Flat2
Vallecito2
Wallace2

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Freedom Energy Corp29
FREEDOM ENERGY CORP28
Freedom Energy Corporation3

Common questions

Where does Freedom Energy Corp install solar?

Its installs are spread across 5 counties. The most are in Calaveras County (41 installs), followed by Tuolumne County (9).

How often does Freedom Energy Corp install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Freedom Energy Corp installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 60 interconnected installs with a tariff recorded (60) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.