Alternative Power Solutions, Inc.

How many solar installs has Alternative Power Solutions, Inc. done in California, and which license number is on its installs?

Alternative Power Solutions, Inc. has 404 residential solar installs interconnected in California, active in the records from 2002 through 2024 (Nov 25, 2002 to Dec 11, 2024), most of them in Tuolumne County (355), Calaveras County (35) and Stanislaus County (6). The license number recorded on most of its installs, 892261, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
404
Last 24 months
1
Total capacity
2,848.2 kW DC
Median system size
6.7 kW DC
With battery storage
1.5% all time; 100.0% last 24 months
Third-party owned
0.0% of 404 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
4 installs, latest Dec 11, 2024
Ownership types recorded
none recorded
Median battery size
10 kWh (5 installs list a capacity)
First install
Nov 25, 2002
Latest install
Dec 11, 2024
Counties
8
Utilities
PGE 404
CSLB license
892261

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2002 to 2026

YearInstalls interconnectedWith battery storage
200210
200300
200410
200580
200690
200760
200880
2009130
2010120
201160
201280
2013160
2014190
2015300
2016380
2017280
2018330
2019470
2020261
2021310
2022370
2023210
202465
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

4 of its 404 interconnected installs (1.0% of the 404 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 50.0% of those include battery storage. The latest Net Billing Tariff install was approved Dec 11, 2024.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.017543.3%not counted
NEM 2.022555.7%4 (1.8%)
Net Billing Tariff41.0%2 (50.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Alternative Power Solutions, Inc.’s installs. No residential system in the file lists a third-party owner name that matches Alternative Power Solutions, Inc. exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 1 of Alternative Power Solutions, Inc.’s 1 installs name a module maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used modules recorded as Qcells.

In the last 24 months, 1 of Alternative Power Solutions, Inc.’s 1 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (1, 100.0%) used inverters recorded as SolarEdge.

In the last 24 months, 1 of Alternative Power Solutions, Inc.’s 1 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as SolarEdge.

2 of 6 battery-paired PG&E and SCE installs (33.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells1159
Inverter makerSolarEdge1213
Battery makerSolarEdge11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 395 of 404 installs, inverters on 404. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Alternative Power Solutions, Inc. as developer on 3 battery storage projects and as installer on 2 (2 name it as both), 3 projects in all with 49 kWh of storage. 2 have the status Paid, with $39,455 in current incentive allocations. Applications were received from May 1, 2020 to Oct 28, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid240$39,455
Cancelled110$1,440

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency240$39,4552$39,455
Small Residential Storage110$1,4400$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
892261Not found in the CSLB License Master file pulled Nov 4, 2026314

License numbers are the ones the utilities recorded on the interconnection applications (316 of 404 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Tuolumne355
Calaveras35
Stanislaus6
Mariposa3
Merced2
Amador1
Nevada1
San Joaquin1

Top cities

CityInstalls
Sonora208
Groveland65
Tuolumne21
Soulsbyville16
Jamestown14
Twain Harte14
Angels Camp12
Columbia9
Copperopolis9
Murphys7
La Grange4
Mi Wuk Village4
Chinese Camp2
Coulterville2
Oakdale2

Names as recorded by the utilities

The utilities recorded this installer under 11 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Alternative Power Solutions, Inc.162
ALTERNATIVE POWER SOLUTIONS INC136
Alternative Power Solutions37
ALTERNATIVE POWER SOLUTIONS INC.23
Alternative Power Solutions, Inc15
Alternative Power Solutions Inc.14
Alternative Power Solutions inc.10
Alternative Power Solutions Inc4
alternative Power Solutions1
Alternative Power Solutions inc1
Alternative Power Solutions, inc.1

Common questions

Where does Alternative Power Solutions, Inc. install solar?

Its installs are spread across 8 counties. The most are in Tuolumne County (355 installs), followed by Calaveras County (35).

How often does Alternative Power Solutions, Inc. install batteries with solar?

1.5% of its interconnected solar installs include battery storage across all years, and 100.0% in the last 24 months (1 of 1).

How many Alternative Power Solutions, Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

4 of its 404 interconnected installs (1.0% of the 404 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 50.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.