Home solar in ZIP code 95229, California

Service city recorded on most installs: Douglas Flat. County: Calaveras County.

How many homes in ZIP code 95229 have solar?

PG&E, SCE and SDG&E interconnected 31 residential solar systems in ZIP code 95229 through Aug 31, 2026, 5 of them in the last 24 months (Sep 2024 through Aug 2026). The utilities recorded Douglas Flat, Calaveras County, as the service city on 26 of them. Sunrun has the most installs recorded in this ZIP, 7.

Counts of interconnected systems from utility records, not a rating of any installer.

Data: California DG Stats interconnection records (Interconnected_Project_Sites_2026-08-31.zip), which run through Aug 31, 2026. ZIP codes are the service ZIP the utility recorded on each project.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

At a glance

Residential solar installs
31
Last 24 months
5 (Sep 2024 through Aug 2026)
Capacity
212.3 kW DC
Median system size
7.6 kW DC
Net Billing Tariff (NEM 3.0)
5 installs, 16.1% of those with a tariff recorded
Utility
PGE 31
First install in data
Jul 27, 2009
Latest install in data
Mar 22, 2026

Installs by year

YearInstalls interconnectedWith battery storage
200920
201000
201100
201200
201300
201410
201520
201610
201740
201831
201910
202021
202100
202251
202351
202422
202522
2026 (through Aug 31, 2026)11

Battery storage

29.0% of the residential solar installs here include battery storage across all years (9 of 31). In the last 24 months the share was 100.0% (5 of 5).

Net metering tariff

Of the 31 installs with a net metering tariff recorded: NEM 1.0 6 (19.4%), NEM 2.0 20 (64.5%), the Net Billing Tariff (often called NEM 3.0) 5 (16.1%). The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Lease, PPA or owned

32.3% of the 31 installs with ownership recorded are third-party owned (a lease or power purchase agreement); the other 21 are recorded as not third-party owned. Ownership types recorded: PPA 9, lease 1.

Installers by installs in 95229

Installers with a page in this index, most installs in this ZIP first. 13 such installers have at least one install here. 5 more installs were by 4 installer names without a page in this index. 1 were self-installed or had no installer recorded. Counts of connected systems, not a rating.

InstallerInstalls in 95229Last 24 months
Sunrun71
V3 Electric42
Gold Electric, Inc.30
Tesla Energy Operations (formerly SolarCity)20
Advanced Solar Energy10
CALIFORNIA RENEWABLE ENERGY10
Empower Electric Solar11
FREEDOM FOREVER LLC10
GCI Solar10
POWUR HOME CONSTRUCTION11

City and county recorded for 95229

The Service City and Service County the utilities entered on this ZIP’s installs, as recorded. No outside ZIP directory is used.

Recorded asInstalls
City: Douglas Flat26
City: Vallecito3
City: Murphys2
County: Calaveras County31

Common questions

How common are home batteries with solar in 95229?

29.0% of the residential solar installs here include battery storage across all years (9 of 31). In the last 24 months the share was 100.0% (5 of 5).

How many solar installs in 95229 are under NEM 3.0?

5 of the 31 installs here with a tariff recorded (16.1%) were interconnected under the Net Billing Tariff, often called NEM 3.0, which applies to interconnection applications submitted on or after April 15, 2023.

Which solar installers have the most installs in 95229?

Among installers with a page in this index, by installs interconnected here through Aug 31, 2026: Sunrun (7), V3 Electric (4), Gold Electric, Inc. (3). These are counts of connected systems, not a rating of price, workmanship or service.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.