Home solar in ZIP code 94619, California
Service city recorded on most installs: Oakland. County: Alameda County.
How many homes in ZIP code 94619 have solar?
PG&E, SCE and SDG&E interconnected 1,495 residential solar systems in ZIP code 94619 through Aug 31, 2026, 160 of them in the last 24 months (Sep 2024 through Aug 2026). The utilities recorded Oakland, Alameda County, as the service city on 1,495 of them. Tesla Energy Operations (formerly SolarCity) has the most installs recorded in this ZIP, 178.
Counts of interconnected systems from utility records, not a rating of any installer.
Data: California DG Stats interconnection records (Interconnected_Project_Sites_2026-08-31.zip), which run through Aug 31, 2026. ZIP codes are the service ZIP the utility recorded on each project.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
At a glance
- Residential solar installs
- 1,495
- Last 24 months
- 160 (Sep 2024 through Aug 2026)
- Capacity
- 7,357.4 kW DC
- Median system size
- 4.4 kW DC
- Net Billing Tariff (NEM 3.0)
- 170 installs, 11.4% of those with a tariff recorded
- Utility
- PGE 1,495
- First install in data
- Feb 15, 2002
- Latest install in data
- Aug 28, 2026
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2002 | 3 | 0 |
| 2003 | 4 | 0 |
| 2004 | 8 | 0 |
| 2005 | 5 | 0 |
| 2006 | 4 | 0 |
| 2007 | 11 | 0 |
| 2008 | 11 | 0 |
| 2009 | 9 | 0 |
| 2010 | 12 | 0 |
| 2011 | 19 | 0 |
| 2012 | 18 | 0 |
| 2013 | 37 | 0 |
| 2014 | 52 | 0 |
| 2015 | 87 | 0 |
| 2016 | 91 | 0 |
| 2017 | 66 | 0 |
| 2018 | 65 | 2 |
| 2019 | 90 | 10 |
| 2020 | 106 | 28 |
| 2021 | 121 | 38 |
| 2022 | 201 | 42 |
| 2023 | 245 | 48 |
| 2024 | 87 | 50 |
| 2025 | 80 | 58 |
| 2026 (through Aug 31, 2026) | 63 | 58 |
Battery storage
22.3% of the residential solar installs here include battery storage across all years (334 of 1,495). In the last 24 months the share was 81.3% (130 of 160).
Net metering tariff
Of the 1,495 installs with a net metering tariff recorded: NEM 1.0 381 (25.5%), NEM 2.0 944 (63.1%), the Net Billing Tariff (often called NEM 3.0) 170 (11.4%). The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Lease, PPA or owned
12.1% of the 1,495 installs with ownership recorded are third-party owned (a lease or power purchase agreement); the other 1,314 are recorded as not third-party owned. Ownership types recorded: PPA 150, lease 27, prepaid lease 2, other 2.
Installers by installs in 94619
Installers with a page in this index, most installs in this ZIP first. 212 such installers have at least one install here. 35 more installs were by 35 installer names without a page in this index. 25 were self-installed or had no installer recorded. Counts of connected systems, not a rating.
| Installer | Installs in 94619 | Last 24 months |
|---|---|---|
| Tesla Energy Operations (formerly SolarCity) | 178 | 5 |
| Kota Construction LLC | 119 | 1 |
| Sunrun | 118 | 20 |
| SunPower | 79 | 1 |
| Sungevity, Inc. | 51 | 0 |
| Save a Lot Solar | 41 | 1 |
| Semper Solaris Construction Inc | 35 | 6 |
| NRG Clean Power | 33 | 4 |
| BETTER EARTH ELECTRIC INC | 31 | 1 |
| BRIGHT OPS | 28 | 28 |
City and county recorded for 94619
The Service City and Service County the utilities entered on this ZIP’s installs, as recorded. No outside ZIP directory is used.
| Recorded as | Installs |
|---|---|
| City: Oakland | 1,495 |
| County: Alameda County | 1,495 |
Common questions
How common are home batteries with solar in 94619?
22.3% of the residential solar installs here include battery storage across all years (334 of 1,495). In the last 24 months the share was 81.3% (130 of 160).
How many solar installs in 94619 are under NEM 3.0?
170 of the 1,495 installs here with a tariff recorded (11.4%) were interconnected under the Net Billing Tariff, often called NEM 3.0, which applies to interconnection applications submitted on or after April 15, 2023.
Which solar installers have the most installs in 94619?
Among installers with a page in this index, by installs interconnected here through Aug 31, 2026: Tesla Energy Operations (formerly SolarCity) (178), Kota Construction LLC (119), Sunrun (118). These are counts of connected systems, not a rating of price, workmanship or service.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.