WICKS

How many solar installs has WICKS done in California, and which license number is on its installs?

WICKS has 121 residential solar installs interconnected in California, active in the records from 2025 through 2026 (Apr 1, 2025 to Aug 21, 2026), most of them in Santa Barbara County (57), San Luis Obispo County (40) and Ventura County (19). CSLB lists license 1127078 (WICKS) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-39, C-46, D-12, expires Sep 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
121
Last 24 months
121
Total capacity
986.7 kW DC
Median system size
7.8 kW DC
With battery storage
92.6% all time; 92.6% last 24 months
Third-party owned
0.0% of 121 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
107 installs, latest Aug 21, 2026
Ownership types recorded
none recorded
Median battery size
13.5 kWh (97 installs list a capacity)
First install
Apr 1, 2025
Latest install
Aug 21, 2026
Counties
5
Utilities
SCE 68, PGE 53
CSLB license
1127078

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2025 to 2026

YearInstalls interconnectedWith battery storage
20257369
2026 (through Aug 31, 2026)4843

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

107 of its 121 interconnected installs (88.4% of the 121 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 91.6% of those include battery storage. The latest Net Billing Tariff install was approved Aug 21, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.010.8%not counted
NEM 2.01310.7%13 (100.0%)
Net Billing Tariff10788.4%98 (91.6%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on WICKS’s installs. No residential system in the file lists a third-party owner name that matches WICKS exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 118 of WICKS’ 121 installs name a module maker in the “Generator Manufacturer” fields, and most of those (104, 88.1%) used modules recorded as VSUN (Vietnam Sunergy).

In the last 24 months, 121 of WICKS’ 121 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (96, 79.3%) used inverters recorded as Tesla.

In the last 24 months, 100 of WICKS’ 121 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (80, 80.0%) used batteries recorded as Tesla.

100 of 112 battery-paired PG&E and SCE installs (89.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerVSUN (Vietnam Sunergy)104104
SunPower55
Trina Solar44
REC33
Silfab33
Inverter makerTesla9696
Enphase2020
FranklinWH1010
SMA44
SunPower44
Battery makerTesla8080
FranklinWH1818
Enphase22

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 118 of 121 installs, inverters on 121. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1127078WICKS (Limited Liability)CLEARC-10 Electrical Contractor; C-39 Roofing Contractor; C-46 Solar Contractor; D-12Sep 27, 2024Sep 30, 2028121

License numbers are the ones the utilities recorded on the interconnection applications (121 of 121 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1127078. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Santa Barbara57
San Luis Obispo40
Ventura19
Los Angeles3
Monterey2

Top cities

CityInstalls
Santa Barbara37
San Luis Obispo11
Ventura9
Arroyo Grande7
Goleta7
Los Osos5
Pismo Beach5
Atascadero3
Solvang3
Thousand Oaks3
Agoura Hills2
Buellton2
Camarillo2
Carpinteria2
Cayucos2

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
WICKS121

Common questions

Where does WICKS install solar?

Its installs are spread across 5 counties. The most are in Santa Barbara County (57 installs), followed by San Luis Obispo County (40).

How often does WICKS install batteries with solar?

92.6% of its interconnected solar installs include battery storage across all years, and 92.6% in the last 24 months (112 of 121).

How many WICKS installs are under NEM 3.0 (the Net Billing Tariff)?

107 of its 121 interconnected installs (88.4% of the 121 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 91.6% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.