VALLEY ELECTRICAL SOLUTIONS

How many solar installs has VALLEY ELECTRICAL SOLUTIONS done in California, and which license number is on its installs?

VALLEY ELECTRICAL SOLUTIONS has 61 residential solar installs interconnected in California, active in the records from 2020 through 2026 (Jan 24, 2020 to May 4, 2026), most of them in Fresno County (42), Madera County (6) and Merced County (6). CSLB lists license 960571 (VALLEY ELECTRICAL SOLUTIONS) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires May 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
61
Last 24 months
6
Total capacity
593.1 kW DC
Median system size
8.6 kW DC
With battery storage
11.5% all time; 100.0% last 24 months
Third-party owned
0.0% of 61 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
7 installs, latest May 4, 2026
Ownership types recorded
none recorded
Median battery size
11.5 kWh (3 installs list a capacity)
First install
Jan 24, 2020
Latest install
May 4, 2026
Counties
6
Utilities
PGE 61
CSLB license
960571

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2020 to 2026

YearInstalls interconnectedWith battery storage
2020130
2021100
2022190
2023110
202443
202500
2026 (through Aug 31, 2026)44

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

7 of its 61 interconnected installs (11.5% of the 61 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The latest Net Billing Tariff install was approved May 4, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.05488.5%0 (0.0%)
Net Billing Tariff711.5%7 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on VALLEY ELECTRICAL SOLUTIONS’s installs. No residential system in the file lists a third-party owner name that matches VALLEY ELECTRICAL SOLUTIONS exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 6 of VALLEY ELECTRICAL SOLUTIONS’ 6 installs name a module maker in the “Generator Manufacturer” fields, and most of those (4, 66.7%) used modules recorded as LONGi.

In the last 24 months, 6 of VALLEY ELECTRICAL SOLUTIONS’ 6 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (3, 50.0%) used inverters recorded as Enphase.

In the last 24 months, 5 of VALLEY ELECTRICAL SOLUTIONS’ 6 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (3, 60.0%) used batteries recorded as Enphase.

6 of 7 battery-paired PG&E and SCE installs (85.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLONGi49
Qcells228
Inverter makerEnphase351
Tesla22
Qcells11
Battery makerEnphase33
Tesla22

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 59 of 61 installs, inverters on 61. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
960571VALLEY ELECTRICAL SOLUTIONS (Corporation)CLEARB General Building Contractor; C-10 Electrical ContractorMay 4, 2011May 31, 202761

License numbers are the ones the utilities recorded on the interconnection applications (61 of 61 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 960571. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Fresno42
Madera6
Merced6
Kern4
San Luis Obispo2
Kings1

Top cities

CityInstalls
Fresno28
Clovis12
Atwater4
Bakersfield4
Madera3
North Fork2
Coarsegold1
Lemoore1
Mendota1
Nipomo1
Reedley1
San Luis Obispo1
Stevinson1
Winton1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
VALLEY ELECTRICAL SOLUTIONS61

Common questions

Where does VALLEY ELECTRICAL SOLUTIONS install solar?

Its installs are spread across 6 counties. The most are in Fresno County (42 installs), followed by Madera County (6).

How often does VALLEY ELECTRICAL SOLUTIONS install batteries with solar?

11.5% of its interconnected solar installs include battery storage across all years, and 100.0% in the last 24 months (6 of 6).

How many VALLEY ELECTRICAL SOLUTIONS installs are under NEM 3.0 (the Net Billing Tariff)?

7 of its 61 interconnected installs (11.5% of the 61 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.